Laserfiche WebLink
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 62 <br />SP 0202-101 <br />Table 3151-1A <br />Multi Stress Creep Recovery (MSCR) Test Requirements <br />Binder Code for Jnr@3.2kPa, <br />Grade* 2360 Mix Design %R @ 3.2kPa, min.** Jnr Difference, max*** <br />maximum <br />PG 58S-28 B 4.5 N/A 75 % <br />PG 58H-28 E 2.0 30 % 75 % <br />PG 58V-28 H 1.0 55 % 75 % <br />PG58E-28 0.5 75 % N/A <br />PG58S-34 4.5 N/A 75 % <br />PG58H-34 C 2.0 30 % 75 % <br />PG58V-34 F 1.0 55 % 75 % <br />PG58E-34 I 0.5 75 % N/A <br />PG49S-34 M 4.5 N/A 75 % <br />PG52S-34 A 4.5 N/A 75 % <br />PG64S-22 L 4.5 N/A 75 % <br />* LTPP Bind temperature for Minnesota is 58°C for the high PG Binder Grade temperature. The bottom three grades are <br />special use binders and are to be tested at the high temperature indicated by the grade (example: PG 49S-34 is tested @ <br />49C). <br />** Use in place of Appendix Xl in AASHTO - M332. <br />*** Jnr Difference is waived for "E" grade binders. <br />Use asphalt binder supplier recommendations for mixing and compaction temperatures. <br />S-51 FINAL ESTIMATE AND FINAL PAYMENT <br />The following provisions shall apply to preparation of the Final Estimate and execution of Final <br />Payment under this Contract: <br />S-51.1 FINAL ESTIMATE <br />State Law provides that the final estimate will be made within 90 days after completion of all <br />work required under this Contract. If, however, the total value of the Contract exceeds $2,000,000.00, the 90 day <br />requirement will not apply and the time allowed for making such final estimate shall be 180 days after the work <br />under this Contract has been, in all things, completed to the satisfaction of the Commissioner. <br />