Laserfiche WebLink
SALT Schedule of Materials Control - Local Government Agency <br />BITUMINOUS QUALITY MANAGEMENT <br />The Contractor shall provide and maintain a quality control program as detailed in Specification 2360.2.G. <br />The Engineer shall review the quality control program for compliance. <br />Contractor - QC Agency - Testing <br />Testing Rates Rates <br />Production Testing Rates <br />Type of Test <br />Bulk Specific Gravity <br />Maximum Specific Gravity <br />Air Voids (calculated) <br />Asphalt Content <br />Adj. Asphalt Film Thickness (AFT) <br />Gradation <br />Fines to Effective Asphalt Ratio calc'd <br />Coarse Aggregate Angularity (CAA) <br />Fine Aggregate Angularity (FAA) <br />Added AC/Total AC Ratio (calc'd) <br />Bulk Specific Gravity <br />Maximum Specific Gravity <br />Air Voids (calculated) <br />Asphalt Content <br />Adj. Asphalt Film Thickness (AFT) <br />Gradation (minimum of 1 per day) <br />Added AC/Total AC Ratio (calculated) <br />Coarse Aggregate Angularity (CAA) <br />Fine Aggregate Angularity (FAA) <br />TSR <br />Aggregate Specific Gravity <br />Mixture Moisture Content <br />Asphalt Binder Certified Supplier <br />Asphalt Emulsion Certified Supplier <br />Compaction / Density Requirements <br />Small Quantity Requirements <br />Spec Section * <br />2360.2.G.7.b <br />2360.2.G.7.c <br />2360.2.G.7.d <br />2360.2.G.7.a <br />2360.2.E.7.e <br />2360.2.G.7.f <br />2360.2.G.7.a/f <br />2360.2.G.7.g <br />2360.2.G.7.h <br />2360.2.G.7.a <br />2360.2.G.7.b <br />2360.2.G.7.c <br />2360.2.G.7.d <br />2360.2.G.7.a <br />2360.2.E.7.e <br />2360.2.G.7.f <br />2360.2.G.7.a <br />2360.2.G.7.g <br />2360.2.G.7.h <br />2360.2.G.7.i <br />2360.2.G.7.j <br />2360.2.G.7.k <br />2360.2.G.7.1 <br />2357 <br />2360.3.D <br />1 test per 500 tons <br />55 Ib. sample <br />3 full cylinder <br />molds <br />1 test per 1000 <br />tons <br />1 test per 1000 <br />tons 55 Ib. <br />sample 3 <br />full cylinder molds <br />NOTE 1 <br />NOTE 2 <br />1 Verification <br />Mixture Sample <br />test per day, all <br />Verification <br />samples are from <br />a split (QC/QA) <br />sample. <br />1 Verification <br />Mixture Sample <br />test per day/ mix <br />type, submit <br />companion to the <br />QC - CAA & FAA <br />test results. <br />When directed by the Materials <br />Engineer <br />As directed by the Engineer <br />NOTE 3 (1qt. Steel container for asphalt <br />binder. 1/2 gal. plastic container with wide <br />screw top for emulsion) <br />Review special provisions <br />See 2360.2G.5 & 2360.3G <br />Testing rates are minimums, additional testing is encouraged to ensure a quality product. <br />Contact the MnDOT District IA Inspector to provide servicing of your Federal Aid Project. <br />* Review Special Provisions & 2360.2.G Mixture Quality Management. <br />** The testing rates apply only to mixtures that have not been tested on previous projects. <br />Mixtures from previous years should use the start- up testing rates. <br />NOTE At start-up or new Mix Design: 2 tests per day for a minimum of 2 days, then 1 per day if CAA is <br />met. If CAA > 8% of requirement, 1 sample per day but test 1 per week. No testing required for Class <br />1 A and or B Aggregates. <br />NOTE At start-up or new Mix Design: 2 tests per day for a minimum of 2 days, then 1 per day if FAA is <br />2: met. If FAA > 5% of requirement, 1 sample per day but test 1 per week. <br />NOTE Shall be a Certified Supplier - No Samples Required unless otherwise directed by the Engineer. <br />Agencies using MnDOT Metro Inspection Services will be sampled at the current MnDOT Schedule <br />3. of Materials Control rates and will be billed accordingly. <br />2017 <br />