SALT Schedule of Materials Control - Local Government Agency
<br />BITUMINOUS SPECIALTY ITEMS
<br />Type of Test
<br />Gradation
<br />PASSRC & PASB
<br />Micro -Surfacing
<br />Seal Coat & Otto Seal
<br />% Crushing - CAA
<br />PASSRC & PASB
<br />Moisture / Aggregate
<br />Micro -Surfacing
<br />Sand Equivalence
<br />Micro -Surfacing
<br />Flakiness Index
<br />Bituminous Seal Coat
<br />Bituminous Mixture
<br />UTBWC
<br />PASSRC & PASB
<br />Stone Matrix Asphalt - SMA
<br />Lab Manual 1203, 1204,
<br />1205, 1211, 1214, 1806,
<br />1807, 1808, 1813, 1853,
<br />1854, 1855, Al SP-2
<br />AASHTO T305
<br />Asphalt Binder Tests
<br />UTBWC
<br />Micro -Surfacing
<br />Seal Coat & Otto Seal
<br />Tack Coat
<br />PASSRC & PASB
<br />Asphalt Binder Rate
<br />Micro -Surfacing
<br />Fog Seal
<br />Seal Coat & Otto Seal
<br />Bit Tack Coat
<br />Spec I Contractor - QC Testing Rates
<br />2363 1 per 1,000 Ton with a minimum 1
<br />3139.3 per day.
<br />2354
<br />3139.5
<br />2356
<br />3137.2
<br />B
<br />Stockpile: 1/1,500 Tons (min 1/day)
<br />Machine Hopper: 1/500 Ton (min
<br />1/day)
<br />Stockpile: 1/1,500 Tons (min 1/day)
<br />Chip Spreader Hopper: 1/day
<br />2363 1 per 1,000 Ton with a minimum 1
<br />3139.3 per day.
<br />2354 Machine Hopper: 1/500 Tons (min
<br />3139.5 3/day)
<br />2354
<br />2356
<br />Stockpile or Machine Hopper: 1/500
<br />Tons (min 1/day)
<br />Sample taken from first load on first
<br />day, submit to Agency: 30 lbs.
<br />2356 1/300 Tons, min 1/day. %AC,
<br />3151.2G Gradation, Max SpG, Adj.AFT
<br />3151
<br />2350
<br />2365
<br />2353
<br />3151
<br />2354
<br />2356
<br />2357
<br />3151
<br />Asphalt spot check: min 1/day
<br />Tests,%AC,gradation,Gmm,Gmb,
<br />Voids,VMA,CAA,Draindown,VCA,
<br />fines/effective asphalt.
<br />Rate,(1/1000 tons, min.1/day)Agg
<br />SpG, mix moisture, TSR to be tested
<br />as directed by Engineer.
<br />Submit companion 1 per day to
<br />agency: 3 full 6" by 12" cylinders
<br />Agency - Testing Rates
<br />1 per day. 35 lbs.
<br />Stockpile & Machine
<br />Hopper: 1/day
<br />30 lbs.
<br />1/day from Hopper. 30 lbs.
<br />1 per day from gradation test. 35
<br />lbs.
<br />1/day 2lbs
<br />1/day, test at Engineer discretion,
<br />25 lbs.
<br />Agency will test at their discretion,
<br />see Lab Manual 1223
<br />1/day, 20 lbs. 1 cylinder from truck
<br />box.
<br />Tests: %AC, Gradation,
<br />Gmm,Gmb,Voids,VMA,CAA,VCA,
<br />fines/effective asphalt. Agency is
<br />not required to do draindown. Copy
<br />MDR to Project Engineer and
<br />Grading & Base Enginner.
<br />Asphalt Emulsion List Asphalt Binder List
<br />Shall be a Certified Supplier - No Samples Required unless otherwise
<br />directed by the Engineer :
<br />Asphalt Binder: First load, then 1/250,000 gallons.
<br />Sample size of 1 quart metal container.
<br />Emulsified Asphalt: First load, then 1/50,000 gallons.
<br />Sample size of 1/2 gallon wide screw top plastic container.
<br />2354 Verify Application Rate 3/day Verify Application Rate 1/day
<br />2355
<br />2356 Verify Application Rate 1/day Verify Application Rate 1/day
<br />2357
<br />Contact the MnDOT District IA Inspector to provide servicing of your Federal Aid Project.
<br />2017