My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All 95th percentile queues remain at or below four vehicles per approach while <br />delays remain significantly below the LOS D/E boundary for all intersection <br />except TH 10/Alpine Drive. <br />TH 10/Alpine Drive does experience PM queues and delays above the preferred <br />threshold. Projecting the volumes to the 2040 No -Build scenario increase these <br />concerns with the intersection breaking down in the 2040 PM No -Build scenario, <br />operating with 95th percentile queues of 11 vehicles for southwest bound <br />vehicles on Alpine Drive and LOS F for the approach. Also, the left turning <br />vehicles begin to have issues completing their movements due to very heavy <br />through movements along TH 10. Based on these results the Peak Hour Signal <br />Warrants were checked to determine if signalized traffic control is warranted for <br />the intersection. <br />With AM and PM mainline 2040 No -Build volumes above 3,000 vehicles per hour <br />the cross -street volume threshold to warrant a traffic signal is only 100 vehicles <br />per hour. Both the AM and PM No -Build and Build scenarios meet this threshold, <br />with the projected volumes, which suggests the intersection would benefit from <br />signalized traffic control. <br />By installing traffic signal control, gaps in mainline traffic would be produced <br />providing additional time for left turning and U-turning vehicles to safely complete <br />their movements on TH 10. Also, the signal would provide green time for Alpine <br />Drive allowing the queues to clear and prevent excessive backups. It is important <br />to note that the traffic signal would add delay to TH 10 mainline, which is not <br />preferred along arterial roadways. <br />It is also important to note that due to the extended 2040 forecast year, and due <br />to additional volumes based on anticipated, but not guaranteed, developments <br />within the area, these upgrades are not needed immediately upon Capstone <br />Homes construction. Because the volumes are heavily weighted by the <br />additional developments within the area additional monitoring of the TH <br />10/Alpine Drive intersection should occur as the anticipated developments are <br />added to the area to determine when intersection volumes rise above the Eight - <br />Hour Traffic Warrant. <br />Turn -Lane Warrants were also checked at each of the site accesses to <br />determine if any additional turn treatments are required. With the existing low <br />speed along Alpine Drive and Puma Street, the Turn -Lane Warrants published <br />by MnDOT will not be fulfilled, as a 45 MPH minimum speed limit is not present <br />on either roadway. The 30 MPH speed limit is consistent for a neighborhood <br />street. A preliminary Turn -Lane Warrant analysis was completed based on <br />volumes alone, ignoring the 45 MPH minimum speed requirement as well as <br />sight line/sight distance checks at each access. <br />Traffic Impact Study 9 <br />Capstone Homes Residential Development <br />NSULTIING <br />
The URL can be used to link to this page
Your browser does not support the video tag.