My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:27 PM
Creation date
8/16/2017 2:03:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Trott Brook Addition (CUP, Sketch Plan, Final Plat and Site Plan) <br />April 28, 2017; revised June 9, 2017 <br />Page 2 of 5 <br />C2: <br />C3: <br />Ll: <br />1. A cross -access easement is required for the proposed northern access as it straddles the <br />boundary of Lots 1 and 2. <br />2. Protect septic area(s) throughout construction. Add this note to plan set and add barrier <br />(silt fence or snow fence) to demark location(s) of septic area(s) to plan set. <br />3. Provide clarification of what the septic area next to the jungle gym is. Is that the current <br />location of the septic system? Is the septic area near the storm water pond a secondary <br />location? These need to be labeled accurately and both must be protected throughout <br />construction (see #2 above). <br />4. Add the `Future One (1) Story Activity Center footprint and note to this sheet. Without it, <br />the future construction of the Activity Center will require an amendment to the Conditional <br />Use Permit. <br />5. Septic system must be evaluated to ensure sufficient capacity to accommodate the proposed <br />building expansion. If the septic system is not properly sized, it will need to be updated as <br />part of the building expansion project. Coordinate with the Building Official for this <br />determination. <br />6. The building expansion may require fire suppression. Coordinate with the Building <br />Official for this determination. <br />7. Show proposed Outlot A on all plan sheets. <br />1. A cross -access easement is required for the proposed northern access as it straddles the <br />boundary of Lots 1 and 2. <br />2. Protect septic area(s) throughout construction. Add this note to plan set and add barrier <br />(silt fence or snow fence) to demark location(s) of septic area(s) to plan set. <br />3. Provide clarification of what the septic area next to the jungle gym is. Is that the current <br />location of the septic system? Is the septic area near the storm water pond a secondary <br />location? These need to be labeled accurately and both must be protected throughout <br />construction (see #2 above). <br />4. Show proposed Outlot A on all plan sheets. <br />1. Protect septic area(s) throughout construction. Add this note to plan set and add barrier <br />(silt fence or snow fence) to demark location(s) of septic area(s) to plan set. <br />2. Provide clarification of what the septic area next to the jungle gym is. Is that the current <br />location of the septic system? Is the septic area near the storm water pond a secondary <br />location? These need to be labeled accurately and both must be protected throughout <br />construction (see #2 above). <br />3. Show proposed Outlot A on all plan sheets. <br />4. Add note stating planting depth shall be such that the first set of primary roots shall be at <br />finished grade. <br />5. The City requires a two (2) year warranty on all required landscaping. <br />Staff provides the following comments for general review of applications: <br />
The URL can be used to link to this page
Your browser does not support the video tag.