Laserfiche WebLink
11-iiiHakanson <br />Anderson <br />June 29, 2017 <br />Main Office: <br />3601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 Fax: 763/427-0520 <br />www.haa-inc.com <br />Patrick Brama, Economic Development Manager <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />RE: Sunfish Lake Gas Station Demolition <br />Dear Mr. Brama: <br />Thank you for this opportunity to provide this proposal. We would describe the project and associated <br />scope of work as follows: <br />PROJECT DEFINITION <br />The project is defined as services to allow for the demolition of the former convenience store and gas <br />station located at the intersection of Sunfish Lake Boulevard and Highway 10. It is proposed that the <br />building, pump canopy, underground conduit/wiring, vacuum bays and other miscellaneous site <br />features be removed and that the Contractor will be responsible for disposing of all materials at their <br />cost. <br />We understand that the gas pumps and underground storage tanks have already been removed from this <br />site. <br />SURVEYING SERVICES <br />It is assumed that the ALTA/NSPS Land Title Survey prepared by E.G. Rud & Sons, Inc. will be <br />provided to us in electronic (autocad) format for our use. A boundary survey is not included in our <br />scope of work. <br />Hakanson Anderson will perform a topographic survey of the site. We will overlap as necessary onto <br />the adjacent property to ensure that restoration plans can be prepared. We will call in a Gopher State <br />One Call locate and survey utility markings such that underground features can be depicted on our plan. <br />Our survey will provide spot elevations on surfaces and will be taken to provide one -foot contour <br />intervals. Benchmarks will be established for future reference and tied into MnDOT vertical control. <br />PREPARE BIDDING DOCUMENTS FOR DEMOLITION <br />Hakanson Anderson will prepare bidding documents for the building and parking lot demolition. The <br />project will include demolition and removal of all remaining components of the building, demolition <br />and removal of the canopy and parking lot, underground conduit/wiring, site grading, and restoration. <br />