My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:56 PM
Creation date
8/16/2017 2:24:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Patrick Brama <br />June 29, 2017 <br />Page 2 <br />After demolition of the building and parking area, it is anticipated that the site may be restored as a <br />parking area. We anticipate preparing a site plan, grading plan, and details to depict the proposed <br />restoration plans of the site. During construction, it will be necessary to maintain access through the <br />site on the existing paved driveway / entrance from Sunfish Lake Boulevard to allow continued access <br />to the adjacent building. <br />Our services will include reviewing the available information, preparing plans to define the scope of <br />the removals, preparing the erosion and sediment control plan, preparing the project specifications, <br />estimating quantities, estimating the construction cost, preparing the bid proposal, and preparing the <br />restoration plan. We will determine the storm sewer and other utilities that will be removed under this <br />contract. We will also identify the existing utilities that must be protected during the project, such as <br />the water and sewer mains that dissect the property. <br />BIDDING <br />Hakanson Anderson will prepare and submit the Advertisement for Bids as required by MN statutes. <br />During the bidding period, we will answer Contractor questions as necessary. Hakanson Anderson will <br />conduct a mandatory pre -bid meeting with interested bidders. The bidders will have the opportunity to <br />tour and inspect the building and the site prior to submitting their bid. We will conduct the bid opening. <br />After the bid opening, we will prepare a bid tabulation and prepare a written recommendation for award <br />of the contract. <br />PERMIT APPLICATIONS <br />If necessary, we will complete the Storm Water Pollution Prevention Plan (SWPPP) as required for the <br />NPDES Construction Permit. The contract will require that the Contractor pay the permit fee and obtain <br />the permit. <br />If necessary, we will complete a LRRWMO permit application for the land disturbance. It is assumed <br />that the City will pay any permit costs associated with obtaining the permit. <br />MEETINGS <br />We will attend progress meetings with City staff during the preparation of the bidding documents as <br />necessary. We will also attend and conduct the pre -bid and bid opening meetings. <br />CONSTRUCTION PHASE SERVICES <br />If requested, we will perform construction phase services. Construction phase services includes <br />coordinating and attending the pre -construction conference, periodic site visits to check on the progress <br />of the work, construction observation, construction staking, responding to questions from the City / <br />Contractor, preparing pay estimates, and other related services. It is proposed that construction phase <br />services will be invoiced on an hourly basis and are separate from the base services described above. <br />Hakanson <br />■■Anderson <br />
The URL can be used to link to this page
Your browser does not support the video tag.