My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:56 PM
Creation date
8/16/2017 2:24:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lour 1111.1siion: To work together to reiposibty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session 7. 14. <br />Meeting Date: 07/25/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #17-07-181 Accepting Bids and Awarding Contract for Improvement Project #17-04, Sunwood <br />Drive Striping Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #17-07-181 accepting Bids and awarding a Contract for <br />construction for Improvement Project #17-04, Sunwood Drive Striping Improvements. <br />Background: <br />The existing striping along Sunwood Drive between Armstrong Boulevard and Ramsey Boulevard is missing or <br />faded in many areas, and some areas are not striped appropriately based on development that occurred since the <br />street was originally striped. Staff therefore prepared plans and specifications for completing striping improvements <br />along this segment of Sunwood Drive in 2017, which is Improvement Project #17-04. <br />On April 18, 2017, Staff presented preliminary plans for proposed Sunwood Drive striping improvements to the <br />Public Works Committee. Based on feedback received Staff prepared draft plans and specifications and presented <br />them to the Public Works Committee on June 20, at which time the Public Works Committee recommended City <br />Council approval. <br />In general, the draft plans replace all existing center two-way turn lanes with dedicated left turn lanes for public <br />streets and private accesses per existing access locations. In addition, several dedicated right turn lanes were added. <br />More specifically, dedicated left turn lanes were incorporated for Casey's gas station and convenience store, the <br />west driveway for the Residence at the COR apartments, and for the new segment of Yolite Street south of <br />Sunwood Drive (to be constructed as part of the Stonebrook development). In addition, dedicated right turn lanes <br />are proposed at Yolite Street, Casey's, and Center Street. <br />No street sign removals or improvements are included in the plans since Public Works staff will complete this work <br />in-house. <br />Notification: <br />No notifications are required for this case. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.