My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:34:23 PM
Creation date
8/16/2017 2:25:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY COST OPINION <br />BUNKER LAKE INDUSTRIAL PARK <br />PSD, LLC <br />BM PROJECT NO. R16.113129 <br />PHASE 1 - SITE GRADING <br />ITEM <br />Exhibit B <br />Engineer's Estimate <br />7/6/2017 <br />NO. ITEM UNIT QTY UNIT PRICE TOTAL <br />1 MOBILIZATION LS $5,000.00 $5,000 00 <br />2 CLEARING & GRUBBING LS 1 $45,000.00 $45,000.00 <br />3 COMMON EXCAVATION (EV) CY 110,000 53.00 $330,000.00 <br />4 TRAFFIC CONTROL LS 1 $1,500.00 $1,500 00 <br />5 STABILIZED CONSTRUCTION EXIT LS 1 $1,500.00 $1,500.00 <br />6 SILT FENCE, TYPE MS LF 2,810 $2 60 $7,306 00 <br />7 SEDIMENT CONTROL LOG TYPE STRAW LF 180 $3.15 $567.00 <br />8 SITE (TURF) RESTORATION - SEED, FERTILIZE & MULCH SY 175,000 $0.75 $131,250.00 <br />9 EROSION CONTROL BLANKETS CATEGORY 3 SY 7,200 $2.10 $15,12000 <br />ESTIMATED CONSTRUCTION COST <br />CONSTRUCTION CONTINGENCY (10 % ) <br />TOTAL ESTIMATED CONSTRUCTION COST <br />Page 1 of 1 <br />$537,243.00 <br />$53,724.30 <br />$590,967.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.