Laserfiche WebLink
Homes as Grand Marshal in the upcoming Happy Days Parade on Saturday, September 9. Please <br /> join us in congratulating them on their achievement! <br /> Happy Days Committee Looking For Helping Hands. If you are interested in volunteering at <br /> Ramsey's Happy Days Festival on Saturday, September 9, visit our website at <br /> www.cityoframsey.com/Happy-Days for a list of opportunities to get involved. Sign up for a <br /> volunteer shift online or contact the Happy Days Committee at akrattenmaker@cityoframsey.com <br /> or 763-576-4310 for more information. <br /> Early Registration for Happy Days Activities Closes Friday,August 25. Early registration for <br /> participation in the Happy Days 5k or Family Bike Tour closes tomorrow, Friday, August 25. <br /> Day-of registration will also be offered at both of these events. Registration for the Happy Days <br /> Bean Bag Tournament and the Talent Show closes Friday, August 25. Please visit <br /> www.cityoframsey.com/Happy-Days for registration materials and more information. <br /> City Improvement Project Updates <br /> Sunwood Drive Reconstruction—Ramsey Boulevard to Bunker Lake Boulevard. This <br /> segment of Sunwood Drive is being reconstructed throughout the month of August. Work <br /> includes replacing damaged concrete curb and gutter,reconstructing driveways,reclaiming <br /> bituminous pavement, striping, and turf restoration. Substantial project completion is <br /> scheduled to occur by September 1, with final project completion required by September <br /> 30. Intermittent lane closures will occur from time to time. <br /> Alpine Drive Reconstruction—Armstrong Boulevard to Variolite Street. This segment <br /> of Sunwood Drive is being reconstructed throughout the month of August. Work includes <br /> replacing damaged concrete curb and gutter, reconstructing driveways, reclaiming <br /> bituminous pavement, striping, and turf restoration. Substantial project completion is <br /> scheduled to occur by September 1, with final project completion required by September <br /> 30. Alpine Drive will be closed to traffic throughout most of this project. <br /> Bunker Lake Boulevard Utilities Extensions. This work includes extending public <br /> utilities (sanitary sewer and watermain) along Bunker Lake Boulevard, roughly 1,400 feet <br /> east of Puma Street. This work will be complete by September 1. Single lane and full road <br /> closures will occur from time to time on Bunker Lake Boulevard between Puma Street and <br /> Armstrong Boulevard. <br /> 2017 Crackseal and Sealcoat Improvements. Over 13.5 miles of City streets are in the <br /> process of being cracksealed, sealcoated, and re-striped. Work will be completed by <br /> September 1, with street sweeping lasting into late September or early October. <br /> Sunwood Drive Striping Improvements. Sunwood Drive between Zeolite Street and <br /> Rhinestone Street will be restriped during the last week of August. The existing center <br /> two-way turn lane will be replaced with dedicated left turn lanes. Several dedicated right <br /> turn lanes will also be added. Work will be complete by September 1. <br /> Riverdale Drive Extension - Traprock Street to Ramsey Boulevard. Riverdale Drive <br /> will be extended through the Mississippi West Regional Park property to complete the <br /> south Highway 10 frontage road system between Llama Street and Tungsten Street. Work <br />