My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. EXISTING CONDITIONS <br />3.1 Existing Pavement and Soil Conditions <br />As -built record drawings show that the segment of Sunwood Drive between Ramsey Boulevard/ <br />CSAH 56 and Bunker Lake Boulevard/CR 116 was constructed in 1996 using 3.5 inches of <br />bituminous pavement, 5 inches of class 5 aggregate base, B618 concrete curb and gutter, and <br />concrete storm sewer. The street was constructed to a width of 40 feet from face -of -curb to face - <br />of -curb, and is centered within an 80 foot wide right-of-way. Delineated parking lanes exist <br />along both sides of the street. The existing posted speed is 35 mph along this entire segment of <br />Sunwood Drive. The storm sewer system consists of numerous catch basins which drain runoff <br />from the street to adjacent low-lying areas using concrete storm sewer pipes. <br />In 2002 and 2008 the pavement was cracksealed and sealcoated, and spot patching has been <br />applied on an as -needed basis since. In the fall of 2016, this segment of Sunwood Drive was <br />rated with PASER ratings of 3 between Bunker Lake Boulevard/CR 116 and Jaspar Street, and 4 <br />between Jaspar Street and Ramsey Boulevard/CSAH 56. <br />In 2015, City Staff recorded an average annual daily traffic volume of 3,500 (AADT). While <br />truck counts are not available, Staff believes it is reasonable to assume between 5 and 10 percent <br />of vehicles using this street segment can be classified as truck traffic, and that the percentage of <br />trucks using this corridor may increase over time due to current business expansion projects and <br />since several undeveloped but developable parcels exist along the corridor. <br />Northern Technologies, Inc. (NTI) was employed to complete a Geotechnical Exploration and <br />Engineering Review for this project, including eleven (11) soil borings spaced approximately <br />200 feet apart along Sunwood Drive. The locations of the borings are shown in the Boring <br />Location Diagram in Appendix C of NTI's report, attached in Appendix D. <br />The NTI soil borings provide information on existing bituminous pavement and aggregate base <br />course thicknesses, subsurface soil conditions, existing ground water elevations, and potential <br />issues that may be encountered during construction. All soil borings terminated at a nominal <br />depth of 11 feet below the existing ground surface. Groundwater was observed in all soil <br />borings at depths ranging between 7 and 9.5 feet below the existing ground surface. Based on the <br />work proposed and the recorded water level depths, groundwater is not anticipated to be an issue <br />for work completed with this proposed project. <br />The soil borings generally indicate that existing bituminous pavement thicknesses range between <br />4.3 to 8.3 inches, with an average thickness of around 5 inches. Apparent aggregate base was <br />not observed in any of the boring locations. Previously placed fill soils, generally consisting of <br />poorly graded sand with silt (SP-SM), are present at depths ranging from 2.0 to 7.0 feet below <br />the top of the pavement. Native alluvial soils consisting of poorly graded sand (SP), silty sand <br />(SM), and poorly graded sand with silt (SP-SM) generally extend to the bottom of the borings. <br />WSB and Associates (WSB) was employed to complete a total of four pavement corings. Their <br />results showed an average bituminous pavement thickness of close to 5 inches, constructed over <br />a class 5 aggregate base. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.