My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.2 Stormsewer Improvements <br />The existing storm sewer system is in good condition and appears to meet all current <br />State Aid design standards and is therefore not proposed to be improved. The only <br />proposed storm sewer improvements include adjusting and/or repairing catch basin <br />castings as needed. No stormwater quality treatment improvements are required for this <br />project since the street is proposed to be reconstructed at its current width. <br />4.1.3 Geotechnical Considerations <br />Northern Technologies, Inc. (NTI) completed a Geotechnical Exploration and <br />Engineering Review including eleven (11) soil borings spaced at approximate 200 foot <br />intervals along Sunwood Drive. The locations of the borings are shown in the Boring <br />Location Diagram in Appendix C of NTI's report, attached in Appendix D. NTI <br />recommends completing a full reconstruction with subgrade corrections and the removal <br />and replacement of all concrete curb and gutter. This work would result in project costs <br />approximately twice as much as the current estimate included in this report, and would <br />result in significant site access and traffic impacts during construction. <br />WSB completed four (4) pavement cores along Sunwood Drive as shown in their <br />Pavement Evaluations and Recommendations report, attached in Appendix D. WSB <br />recommends leaving all intact existing curb and gutter in place, which staff estimates <br />accounts for over 80% of the existing curb and gutter, which is only 20 years old. WSB <br />also recommends reconstructing only the aggregate base and bituminous pavement by <br />incorporating additional strength in the aggregate base using a Stabilized Full Depth <br />Reclamation process. In total, this work is estimated to cost half as much as a total <br />reconstruction yet would result in a pavement design life of 30-plus years. In considering <br />that the remaining curb and gutter will likely need to be replaced in 30 to 40 years, a total <br />reconstruction could be evaluated at that time. Another benefit to this design is that it <br />would result in minimal impacts to site access and traffic during construction. <br />4.1.4 Other Considerations <br />Driveways: <br />Existing driveways will need to be reconstructed to varying degrees. The limits of <br />construction will vary with each driveway based on the elevations of the street and the <br />parking lot, as well as the driveway pavement type. During design, staff will evaluate the <br />construction limits for each driveway and will incorporate this into the plans, but as with <br />all street reconstruction projects the exact limits of construction will be determined in the <br />field during construction. Right -of -entry forms would be obtained from private property <br />owners if work is required outside City right-of-ways and easements. <br />Irrigation Systems: <br />Developed properties along the project corridor may have private irrigation systems. <br />Impacts to these systems may occur where the existing curb and gutter is being replaced. <br />On past street reconstruction projects, the City repaired private irrigation systems that <br />were damaged as part of the project. Staff recommends foregoing this practice on future <br />projects. Instead, staff recommends notifying property owners in writing of the pending <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.