Laserfiche WebLink
d. Stormwater maintenance through ninety percent (90%) buildout (not <br />required) <br />e. Streets (not required) <br />f. Concrete curb and gutter (not required) <br />g. Street traffic control signals (not required) <br />h. Lot grading (not required) <br />i. Trail development (not required) <br />j. Sidewalks (not required) <br />k. Electricity (within one-fourth mile) (not required) <br />1. Phone (within one-fourth mile) (not required) <br />m. Natural gas (within one-fourth mile) (not required) <br />n. Boulevard sodding (not required) <br />o. Water shut off boxes (not required) <br />p. Easement acquisition <br />q. As -built plans (not required) <br />r. Stage I financial surety (not required) <br />(the "Stage I Improvements"). <br />The DEVELOPER agrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />City Code. Per City Code Section 117-615, the DEVELOPER shall provide the <br />CITY with a set of re -producible as -built plans in Computer Aided Drafting (CAD) <br />format upon completion of the Stage I Improvements and acceptance by the CITY. <br />As as -built plans are a required Stage I Improvement item per City Code Section <br />117-615, the CITY will not release the required Stage I Improvement Financial <br />Guarantee noted in Section 6 below until said as -built plans are provided to the <br />CITY. Additionally, the DEVELOPER agrees to provide to the CITY the plans <br />in CAD format prior to the commencement of construction of the Stage I <br />Improvements. <br />4. Additional Requirements Related to Certain Stage I Improvements. This paragraph <br />intentionally deleted. <br />5. Lot Corner Staking. The DEVELOPER must install lot corner stakes at all lot <br />corners. <br />6. State I Improvement Financial Guarantee. This paragraph intentionally deleted. <br />7. Inspection Fees for the Stage I Improvements. This paragraph intentionally <br />deleted. <br />8. Installation of the State I Improvements. This paragraph intentionally deleted. <br />9. Time of Performance for the Stage I Improvements. This paragraph intentionally <br />deleted. <br />2 <br />