My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Ownership of the Stage I Improvements. This paragraph intentionally deleted. <br />11. Stage I Improvements License. This paragraph intentionally deleted. <br />12. Stage II CITY Improvements. The future improvements the DEVELOPER must <br />construct or install are as follows: <br />a. Street striping and signing (not required) <br />b. Seal coating (not required) <br />c. Street lights (not required) <br />d. Inspections (not required) <br />e. Installation of survey monumentation. <br />f. Stage II cash deposit (not required) <br />(the "Stage II Improvements"). The DEVELOPER must complete the <br />construction of the Stage II Improvements within one (1) year after the date upon <br />which the Plat is recorded. <br />DEVELOPER must install the Stage II Improvements in accordance with the <br />Plans. Per City Code Section 117-615, the DEVELOPER shall provide the CITY <br />with a set of re -producible as -built plans CAD format upon completion of the Stage <br />II Improvements and acceptance by the CITY. Additionally, the DEVELOPER <br />agrees to provide to the CITY the plans in CAD format prior to the commencement <br />of construction of the Stage II Improvements. <br />13. Stage I and Stage II Improvements to Outlots. This paragraph intentionally deleted. <br />14. Financial Guaranty for Stage II Improvements. This paragraph intentionally <br />deleted. <br />15. Warranty for Stage I and Stage II Improvements. This paragraph intentionally <br />deleted. <br />16. Street Cleaning and Clean Up. This paragraph intentionally deleted. <br />17. Payment of Development Fee's. The DEVELOPER must pay to the CITY the <br />fees described on Exhibit B which may include, but are not limited to, Park Land <br />Dedication Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) <br />Fees, Water Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral <br />Fees, Stormwater Management Fees, Street Light as well as Street Light Operation <br />and Maintenance Fees. <br />18. Requirements for Building and Occupancy Permits. <br />a. No building permit for any lot in the Plat shall be issued until the <br />DEVELOPER has: (a) installed a Class 5 driving surface to within 300 feet <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.