My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 09/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:37:55 PM
Creation date
9/13/2017 9:03:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning: <br />A majority of the Subject Property is currently zoned as R-1 Residential (Rural Developing). This allows for the <br />development of single family, detached dwellings with a density of one (1) unit per 2.5 acres. As proposed, the <br />project will require a Zoning Amendment to rezone the Property to R-1 Residential (MUSA), which would allow a <br />net density of up to three (3) units per acre and a minimum lot size of 10,800 square feet. The proposed net density <br />of the project is 1.54 units per acre and it appears to meet the minimum lot size and width standards of the R-1 <br />Residential (MUSA) district. <br />Dimensional/Bulk Standards: <br />The Developer must demonstrate compliance with the bulk standards of the R-1 Residential (MUSA) district, based <br />on the request for a Zoning and Comprehensive Plan Amendment. The Preliminary Plat appears to comply with the <br />standards specified for this zoning district. Specifics are outlined in the Staff Review File. <br />Wetlands: <br />There are wetlands on the Subject Property that have been delineated. The Applicant has encumbered the minimum <br />wetland setback of sixteen and a half feet (16.5') within drainage and utility easements. The Final Plat needs to be <br />revised to ensure that the drainage and utility easements extend at least sixteen and a half feet (16.5') beyond the <br />delineated boundary of the wetland(s). <br />Density Transitioning: <br />As proposed, the development is subject to the density transitioning standards found in City Code Section 117-110. <br />Density transitioning applies to Lots 1-3 Block 1. Density transitioning landscaping has be shown on the landscape <br />plan and should be located in a separate, commonly owned parcel to avoid removals by future homeowners or <br />encumbered with a Landscape and/or Tree Preservation Easement. Discussion with the Applicant outlined the <br />developer's willingness to attempt to reduce tree removal on the east side of the plat as a part of their density <br />transitioning requirements. An exhibit, as part of the revised plan set, was recently submitted detailing a reduction <br />in trees removed, reduced grading, and increased tree planting of Lots 1-3 Block 1. <br />Streets and Access: <br />Seven of the eight lots will gain access from an extension of the Lithium Street cul-de-sac. The eighth lot will retain <br />access from Trunk Highway 47; however, the remainder of the boundary with TH 47 must be shown as restricted <br />access on the Preliminary Plat and Final Plat. It appears that the proposed extension of the Lithium Street cul-de-sac <br />does comply with the minimum design standards. <br />Sidewalks: <br />There is an existing sidewalk along Lithium Street that presently terminates at the edge of the temporary cul-de-sac. <br />Staff is generally supportive of the sidewalk proposed by the Applicant. Staff also realizes the importance of <br />ensuring that the sidewalk can be extended if and when Lithium St. is extended. Staff recommends the applicant <br />prepare a future sidewalk extension exhibit to be recorded against the property along with the Plat. <br />Utilities: <br />Engineering requested additional information from the applicant regarding utilities in the Staff Tech Memo dated <br />8/23/17. The applicant has since submitted revised plans (most recent dating 9/1/17). More detail is requested by <br />the engineering staff in regards to how the Applicant plans to connect the larger lot to services. <br />Grading and Drainage: <br />The project will be subject to review by the Lower Rum River Watershed Management Organization (LRRWMO) <br />regarding both wetlands and storm water. A LRRWMO permit will be required. <br />Tree Preservation/Natural Areas: <br />The City's Environmental Policy Board (EPB) reviewed the Tree Preservation and Landscape Plans at their June <br />19, 2017 meeting. There was significant concern regarding the amount of loss of oaks on the Subject Property. The <br />Natural Resources Inventory does indicate that there is a moderate quality oak forest on the Subject Property that <br />would be significantly impacted by this project. While the project does comply with the City's Tree Preservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.