Laserfiche WebLink
DATE <br />PROJECT. TITLE <br />ESCROW # <br />DEPARTMENT: <br />TECHNICAL REVIEWER: <br />CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />9/7/2017 <br />PROJECT ADDRESS <br />SE CORNER OF 143'D AND JASPAR <br />17-127: BUNKER LAKE INDUSTRIAL PARK ADDITION FINAL PLAT <br />Community Development: Planning Division (Comprehensive Plan and Zoning Code) <br />Name: Eric Zweber, Planning Consultant <br />Phone: (763)762-2837 <br />Email: EZwebernwsbene.com <br />Comments Requiring Plan Revisions: <br />Comments regarding Public Road Improvement plans <br />1. (Sheet G0.01) Modify the Public Road Improvements Title Sheet to include Sheets C4.03 thru C4.05. <br />2. (Sheet C2.05) The north side of the ditch located west of Jackel St NW does not seem to connect with <br />the existing grades which may require grading within the Bunker Lake Blvd. Please revise accordingly. <br />3. (Sheet C2.05) What is the purpose of the gravel access drive? Is it a construction entrance? If it is semi- <br />permanent, a culvert should be installed at the ditch. <br />4. (Sheet C4.04) A condition of approval will be that the private drive (and any necessary development <br />agreement) will be required to be constructed with any improvement/Site Plan approval of Lot 1. <br />5. (Sheet C7.02) No parking sign should be extended around the cul-de-sac. <br />Comments regarding the Bunker Lake Industrial Park Addition Final Plat <br />1. Drainage and Utility Easement over all of Outlot C. <br />Comment regarding Lot 1 Site Improvements plans <br />1. (C2.04) If not completed previously, a condition of approval would include the construction of the Lot 2 <br />stormwater improvements with the Lot 1 stormwater improvements. <br />2. (C2.04) The sidewalk northwest of the building leading to the trash enclosure does not seem to match <br />the grades of the ramp to the east of the sidewalk. Is the sidewalk slope at a 6.9% grade like the ramp or <br />is there a retaining wall separating the two? <br />3. (C2.06) The access drive on the east side of the building is only 20 feet wide, which does not meet the <br />requirement for a two-way access drive. Is this proposed to be a one-way street? <br />4. (C3.01) The curb at the northwest corner of the western ramp lists to top of wall elevations, but there is <br />other top of wall measurements. How extensive (i.e. how long) is this retaining wall? <br />5. (C4.01) The location of CO 2 does not match the location of the roof drain riser on architectural Sheet <br />A3. Please revise accordingly. <br />Comments regarding Building #2 plans <br />1. Consider changing the name of this building to Building #1 to match that it is located on Lot #1 to avoid <br />confusion. <br />2. (Sheet A2) What is the "sanitary line for future develop" running east to west on the southern side of the <br />building? It isn't connected to the mechanical room and is not shown on the utility plan. <br />