Laserfiche WebLink
Review File: 17-127: Bunker Lake Industrial Park Addition <br />Final Plat Review <br />Page 2 of 5 <br />3. (Sheet S1) There is no retaining wall shown at the northwestern corner of the building while there are <br />"top of wall" elevations shown on the grading plan. <br />Comment regarding Lot 2 Site Improvements plans <br />1. (Sheet C2.04) There is no 882 grade on the joint access road on the east side of the site. <br />2. (Sheet C2.06) A construction easement from Lot 1 will be needed to construct the joint access drive as <br />proposed. <br />Comments regarding Building #1 plans <br />1. Consider changing the name of this building to Building #2 to match that it is located on Lot #2 to avoid <br />confusion. <br />2. (Sheet A2) What is the "sanitary line for future develop" running east to west on the southern side of the <br />building? It isn't connected to the mechanical room and is not shown on the utility plan. <br />3. (Sheet Si) Please provide the footing and foundation plan Building #1. The current sheet has the <br />Building #2 foundation shown. <br />Additional Information Required — <br />1. Grading and Erosion Controls Plans for the proposed pond. <br />2. The follow Public Road Improvement Sheets: <br />a. G0.03 <br />b. C0.02 <br />c. C2.06, C2.07, and C2.08 <br />d. C9.01 thru C9.06 <br />3. Signed Application <br />4. Building Sign Plans <br />5. Lighting/Photometric Plans <br />6. Color Building Elevations <br />7. Number of employees <br />8. Water usage <br />9. Building #1 Sheet Si with the Building #1 footing and foundation. The current Building #1 Sheet Si <br />has the Building #2 foundation shown. <br />