Laserfiche WebLink
6401 SUNFISH LAKE BOULEVARD RESTORATION ESTIMATE <br />ALTERNATIVE 3 - MAKE ENTIRE SITE INTO PARKING LOT <br />100% IMPERVIOUS SURFACE <br />Item No. Item Description Unit Unit Price ESTIMATED Esimtated <br />QUANTITY Amount <br />1 AGGREGATE BASE CLASS 5 MODIFIED (CV) (4") CY $ 30.00 450 $ 13,500.00 <br />2 MILL BITUMINOUS PAVEMENT (2' Wide x 1.5" Depth) SY $ 16.00 190 $ 3,040.00 <br />3 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 2.90 240 $ 696.00 <br />4 WEARING COURSE MIXTURE (1.5") TON $ 72.00 280 $ 20,160.00 <br />5 NON -WEARING COURSE MIXTURE (2.0") TON $ 65.00 375 $ 24,375.00 <br />6 4" SOLID LINE - WHITE EPDXY LF $ 0.30 2,800 $ 840.00 <br />Estimated Construction Cost $ 62,611.00 <br />10% Contigency Cost $ 6,261.10 <br />23% Indirect Cost $ 15,840.58 <br />Alternative 3 Estimated Restoration Cost S 84,712.68 <br />