Laserfiche WebLink
construction as far in advance of construction as possibletoallow them adequate time to <br />move their irrigation systemsout of the construction area, and then to replace the systems <br />once work is complete.Staff recommends allowing the private irrigation systems to be <br />replaced in their original locations within City right of way if desired by property owners. <br />Parking Restrictions: <br />Parking is currently provided along both sides ofthe streets and is not currently restricted <br />except for overnight parking per City code. During this project, parking is also proposed <br />to be restricted during allowable working hours. <br />4.2Stormwater Treatment <br />Stormwater retention and/or treatment improvements are notrequired forthis project. <br />4.3WaterMain Improvements <br />No watermain improvements areproposed with this project. <br />4.4Sanitary Sewer Improvements <br />No sanitary sewer improvements areproposed with this project. <br />4.5Construction Methods <br />The existing bituminous pavement section will be reconstructed using the SFDR process outlined <br />within this report. See WSB and Associates Pavement Evaluations and Recommendations report <br />Appendix D <br />in for additional details on the proposed SFDR process. <br />4.6Private Utilities <br />Staff has not yet met with the telephone, gas, power and cable utilities regarding this project. <br />During preparation of plans and specifications,staff will meet with the private utility companies <br />to discuss the proposed improvementsas noted in the project schedule within this report. The <br />alignment and footprint of the streetswill beconsidered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipatedwith this project. <br />Should anyutility companiesindicate they wish to upgrade, replace and/or otherwise modify <br />their services during this project,any suchupgrades, replacementsand/ormodifications will be <br />at the sole discretion and cost of theutility companies. <br />4.7Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />MPCA General Stormwater Permit(NPDES).....Grading and Storm Water <br />A stormwater permit from the Lower Rum River Watershed Management Organization will not <br />be required with this project. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of RamseyProject No. 17-00 <br />Page 8 <br /> <br />