Laserfiche WebLink
4.8Right-of-Ways/Easements <br />It is anticipated that all improvements will occur within existing City right-of-waysand/or <br />easements, with the possible exception of tying into private drivewaysand green areas.It is <br />therefore not anticipated that the City will need to acquire additional permanent right-of-way or <br />easements for this project.As such,costs for right-of-way or easementacquisitionsarenot <br />included in the probable project costs. <br />City staff will work with private property owners as neededto obtain any required rightof <br />entries. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of RamseyProject No. 17-00 <br />Page 9 <br /> <br />