My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/19/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 09/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:10:34 AM
Creation date
10/4/2017 10:23:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.FINANCING <br />5.1Opinion of Cost <br />AppendixB <br />A detailed opinion of probable costsfor the proposed improvements can be found in <br />of this report.The opinion of probable costsincorporatesanticipated 2017construction costs for <br />the proposedimprovementsplus23% indirect costsfor administrative, engineering, financing <br />and legal costs.Construction contingency costs are not included in the estimated costs. <br />City staff prepared the Feasibility Report in-houseas part of staff’s normal duties. <br />Appendix D <br />NTI prepared the Geotechnical Exploration and Engineering Review, included in ,at <br />a cost of $4,400.WSB and Associates, Inc. prepared the Pavement Evaluations and <br />Appendix D <br />Recommendationsincluded in , at anot-to-exceed cost of $2,687.50. <br />5.2Funding <br />5.2.1Assessments <br />The City’s adopted Special Assessments Policy allows special assessments to be levied <br />against all benefiting properties in an amount not to exceed 25% of eligible street <br />reconstruction project costs.Eligible project costs include costs required to reconstruct <br />the street at its current width, and to reconstruct the pavement without increasing its <br />structural capacity.Benefiting properties are considered to be any developable parcel <br />that has,orhasthe ability tocreate, one or more direct accessesonto the segment of <br />Sunwood Drivebeingreconstructed.A total of 9benefitting propertieshave been <br />identifiedfor this project, including two City-owned parcels.The <br />Preliminary Assessment <br />Appendix C <br />. <br />Map and Roll are included in <br />The engineer’s opinion of probable costs for eligible assessment costs totals $607,000. <br />Assessable industrial parcels are preliminarily proposed to be assessed for up to 25 <br />percent of eligible project costs, which totals$151,750.Assessmentterms are proposed <br />atten years. Interest rates are proposed at two percent above the bond interest rate. <br />The “adjusted front footage” method of assessment as identified in the City of Ramsey’s <br />Special Assessments Policywasapplied to assign preliminary assessmentamounts for <br />this project.Staff then enlisted Patchin Messner Dodd and Brumm,the firm the City has <br />used to complete special benefit consultation reports for residential street reconstruction <br />projects, to assign estimated special benefit amounts to allassessable parcels. Staff then <br />applied the lesser of the two amounts to assign proposed preliminary assessmentsto each <br />assessable propertyas shown in the Preliminary Assessment Roll. <br />Special assessments for industrial parcels have never been developed using the recently <br />adopted Special Assessments Policy. In addition, State Statute and the City Charter do <br />not allow for assessments to exceed benefit to the property.Therefore, Staff wants to <br />ensure that allassessmentsappliedwith this project willnot exceed the benefitto <br />assessed properties. Staff therefore recommends orderinga benefit appraisal consultation <br />report for this project in accordance withthe City’s Special Assessments Policyat the <br />time a construction contract is awarded. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of RamseyProject No. 17-00 <br />Page 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.