My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/19/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 09/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:10:34 AM
Creation date
10/4/2017 10:23:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.2City Contribution <br />The City contribution to the project willinclude all fundingin excess of the amount <br />collected through special assessmentsto benefiting properties. This will equal75 percent <br />or more of eligible project costs.Nofunds have been budgeted for this project. <br />The City’s share of eligible project costs related to surface (street) improvements is <br />proposed to come from the previously encumbered 5-year Street Reconstruction and <br />Overlay Program bonds.Stormwater Utility Funds are proposed to payfor all storm <br />sewer improvements. <br />Special assessments are proposed to pay back a portion of these costs based on the final <br />assessments adopted by Council at the end of the project.Based on the estimated costs <br />and fundingprogram developed within this report, approximately 22% of project costs <br />will be assessed. <br />Table 1 <br />illustrates the proposed project fundingbased on the proposed designand <br />funding program outlined within this report.Thisfunding program assumesconstruction <br />will occur in 2017. <br />TABLE 1 <br />Proposed Project Funding <br />ASSESSMENTSCITY FUNDSTOTAL <br />Estimated Costs$133,779.60$473,220.40$607,000 <br />Total Estimated Project Cost$607,000.00 <br />Less SpecialAssessments(22%)-$133,779.60 <br />Subtotal=$473,220.40 <br />Less City BondingFunds-$465,920.40 <br />Subtotal=$7,300.00 <br />Less Stormwater Utility Funds-$7,300.00 <br />TotalRemaining Cost=$0.00 <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of RamseyProject No. 17-00 <br />Page 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.