Laserfiche WebLink
Economic Development Authority (EDA) <br />Meeting Date: 09/14/2017 <br />Submitted For: Tim Gladhill, Community Development <br />By: Eric Maass, Community Development <br />4. 1. <br />Title: <br />Review Status of Request to Install and Maintain a Ground -Mounted Solar Energy System on the Property Legally <br />Described as Lot 3, Block 1 River Crossing Addition (Project No. 17-135); Case of Connexus Energy <br />1. Appeal for issuance of a Development Permit on an officially mapped parcel. <br />2. Zoning Amendment to include Solar Energy Systems as a principal use with the issuance of a Conditional <br />Use Permit in the Public/Quasi-Public District. <br />3. Zoning Amendment to rezone a property from R-2 Residential to Public/Quasi Public. <br />4. Conditional Use Permit to install and maintain a Solar Energy System. <br />Purpose/Background: <br />The purpose of this case is to receive an update from Connexus on a site selection process they have completed <br />related to a new 19 acre solar farm proposed to be constructed in Ramsey. This case is being reviewed with the <br />EDA in response from public comments received at the Public Hearing held by the Planning Commission on <br />September 7, 2017. One of the comments received was that the Connexus Energy Campus is a better suited site <br />from a land use planning perspective than the currently proposed parcel. Many of the Planning Commissioners <br />shared this feeling, but wanted to better understand the economic development implications of this alternative. To <br />arrive at that discussion, Staff has recommended that Connexus Energy provide an overview of how Connexus <br />arrived at the current proposal through their site evaluation process. <br />Connexus Energy has applied for a Zoning Amendment and a Conditional Use Permit to construct a new solar <br />garden on the property legally described as Lot 3, Block 1 River Crossing Addition (the "Subject Property"). The <br />system would have the capability of producing 3.5 megawatts (MW) with ground mounted solar photovoltaic <br />panels and would include 6 MW of battery energy storage. This is one of three (3) sites within Anoka County that <br />Connexus Energy is developing to produce solar energy. <br />The Subject Property is owned by Anoka County and would be leased by Connexus Energy. When the City <br />contemplated solar energy systems several years ago, the Zoning Code was amended to consider ground or building <br />mounted solar energy systems as a permitted accessory use in any zoning district. However, it did not account for, <br />or address, the possibility of a solar energy system being the principal use of a property, as would be the case with <br />Connexus' proposal. <br />Both the current zoning standards for solar energy systems and the information submitted by Connexus are attached <br />for reference. The final design plans are in the process of being prepared by the solar developer (based on site work <br />being conducted now) but are not complete at this time. They have stated that they do not anticipate any major <br />changes from the initial proposed layout and the Site Plan would still be subject to review and approval by the City. <br />Notification: <br />Notification is not required for EDA review, but was provided as part of the Public Hearing held with the Planning <br />Commission. <br />Observations/Alternatives: <br />