As noted, the Subject Property is owned by Anoka County and was initially acquired to accommodate a future <br />bridge crossing. In 2007, the Subject Property was designated with an Official Map to prevent future development <br />from occurring in advance of the bridge crossing. However, the current Highway 10 Access Planning Study no <br />longer identifies this parcel as needed for a potential bridge crossing (with the new Armstrong Blvd overpass <br />alignment). The Planning Commission will need to take action on an appeal to issue any type of development <br />permit on the Subject Property per City Code Section 117-4 (Official Map). <br />As part of the Official Map process in 2007, it was noted that the Subject Property was zoned R-2 Residential and <br />that the intention was to re -guide the parcel as Public/Quasi-Public with the 2008 Comprehensive Plan Update and <br />then subsequently rezone the parcel to Public/Quasi Public. That action did not occur. However, based on the <br />current owner of the Subject Property (Anoka County) and the proposed use (solar farm), it seems reasonable to <br />rezone the property as Public/Quasi-Public (this would also complete the stated intent when the area was officially <br />mapped) and to amend the uses of that zoning district to identify Solar Energy Systems as a principal use with the <br />issuance of a Conditional Use Permit (this district already identifies municipal and private substations as a <br />permitted use). <br />The Environmental Policy Board (EPB) was introduced to this concept at their July meeting and then officially <br />reviewed this request at their August meeting. Questions that the EPB had asked are outlined below along with the <br />responses from the solar developer and/or Connexus Energy. <br />• Nuisance noise: The solar energy system will not have any moving parts (fans, panel movement/rotation, <br />etc.) and therefore there should be no discernible noise generated, with the exception of the initial installation <br />of the solar farm. The battery storage units would include air conditioning. As with any air conditioning <br />system, the air condensing units would be outside and would generate some noise, but should be within <br />allowable standards. <br />• Glare: The panels will be at a fixed tilt, permanently facing south (away from Highway 10), and <br />manufactured with anti -reflective glass specifically designed to reduce glare. A glare study was provided by <br />the solar developer. While it does indicate some glare would be produced at a particular receptor (near the <br />southern touch -down point of the Armstrong Blvd overpass), it is minimal and has low potential to create any <br />after -image. <br />• Environmental Benefits/Impacts: According to the U.S. Department of Energy, few power generating <br />technologies have as little environmental impact as photovoltaic solar panels. A ground mounted solar array <br />generates electricity without any moving parts, requires no water, and produces no direct emissions. <br />Underneath the ground mounted equipment, native vegetation will be established, providing pollinator <br />habitat as well as erosion control and stormwater runoff benefits. Connexus noted that all power generated by <br />this solar energy system would remain in Ramsey. <br />• Final Site Plan plans are being developed presently. Their design team is completing field work on the <br />Subject Property necessary to complete the final design and Site Plan. However, it is not anticipated to have <br />any significant impacts to the conceptual layout provided. <br />While a complete Site Plan is not yet available, consideration of and a recommendation regarding the requested <br />Appeal for a development permit, the Zoning Amendments (both text and map), and Conditional Use Permit can <br />still be addressed. The EPB recommended approval of the Zoning Amendments and Conditional Use Permit with <br />the following conditions (which have been incorporated into the draft Conditional Use Permit): <br />• Submittal of final Site Plan for review and approval by the City. <br />• Submittal of a Glare Study (already received). <br />• Submittal of a Decommissioning Plan (how the site will be deconstructed and restored upon the <br />abandonment of the operation). <br />• Installation of native, sustainable landscape underneath the ground mounted equipment. <br />The City's Comprehensive Plan does address solar access protection within the Land Use Chapter. One of the <br />identified policies for solar access protection is to work with the League of Minnesota Cities, University of <br />Minnesota Extension Services, Minnesota Office of Environmental Assistance, Anoka County, and other agencies <br />to develop programs that increase the use of solar energy systems. It appears that the proposed project would further <br />this policy. <br />Note that the attached, draft Conditional Use Permit was prepared as if the Zoning Amendments, both the text and <br />