My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />Project B1610732.00 <br />November 28, 2016 <br />Page 5 <br />E. Limitations <br />This inspection was limited to areas available for observation via non-destructive means. In any building, <br />the potential exists for hazardous building materials to be located inside walls, above ceilings, under <br />floors, and other inaccessible areas. Braun Intertec cannot be held responsible for the presence of any <br />such hidden materials. In the case of building renovation/demolition, contractors involved in the project <br />should be made aware of this potential. If previously unidentified suspect hazardous building materials <br />are exposed during their activities they should be sampled and analyzed for content prior to any <br />disturbance. <br />Note: A destructive ACM investigation is required by the MPCA prior to building renovation/demolition. <br />It is recommended that the destructive ACM investigation is performed once the building is vacant. <br />Note: It is assumed that pipe insulation may be present in currently inaccessible chases, wall cavities, and <br />above hard ceilings. <br />Note: It should also be noted that in order to maintain the integrity of the roof systems, no roofing <br />materials were sampled. For the purpose of this report, the roofing and flashing materials are assumed <br />to contain asbestos until proven otherwise by sampling and analysis. <br />Note: Various electrical systems were identified during the survey. These systems were believed to be <br />currently "charged" and active. Suspect materials are located within these electrical boxes, control <br />panels (breaker bars, insulation, and electrical wire insulation). For the purpose of this report, all <br />electrical systems associated in these areas assessed are to be assumed to contain asbestos until proven <br />otherwise by sampling and analysis. <br />In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under <br />similar circumstances by reputable members of its profession currently practicing in the same locality. No <br />warranty, express or implied, is made. <br />F. Asbestos Inspector Certification <br />I, the undersigned, do hereby certify that I am an accredited Asbestos Inspector in the State <br />of Minnesota. A photocopy of my current asbestos inspector certificate is attached in Appendix E. <br />Signature: <br />Date: /I6' ?B 20/6 <br />Eric W. Bieniek ( <br />Environmental Technician III <br />Minnesota Department of Health Asbestos Inspector No: A112781 <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.