My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:38:37 PM
Creation date
10/24/2017 2:20:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1081
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1 Park Dedication. The PERMITTEE is responsible for satisfying applicable Park Dedication <br />requirements. The 2017 Park Dedication Fee applicable to the Plat is $2,210.00 per residential <br />unit. The PERMITTEE qualifies for the density bonus for a project in excess of 15 units per acre <br />that is allowed by City Code which permits a Park Dedication Fee of ($2,210 x 54 units = <br />$119,340.00). The PERMITTEE acknowledges that these fees are estimates. The rate in effect <br />when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. The 2017 Trail Development Fee applicable to the Plat is $800.00 <br />per residential unit. The PERMITTEE must pay a Trail Development Fee ($800 x 54 units = <br />$43,200.00). The PERMITTEE acknowledges that these fees are estimates. The rate in effect <br />when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. The 2017 Sanitary Sewer Trunk applicable to <br />the Plat is $1,154.00 per residential unit. PERMITTEE must pay a Sanitary Sewer Trunk Fee of <br />($1,154 x 54 units = $62,316.00). The PERMITTEE acknowledges that these fees are estimates. <br />The rate in effect when the Plat is recorded will be collected. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. The 2017 Water Trunk applicable to the Plat is $1,720.00 per residential <br />unit. PERMITTEE must pay a Water Trunk Fee of ($1,7200 x 54 units = $92,880.00). The <br />PERMITTEE acknowledges that these fees are estimates. The rate in effect when the Plat is <br />recorded will be collected. <br />5. Sanitary Sewer Lateral Benefit Fees. The PERMITTEE is constructing its own lateral service <br />lines; therefore no sanitary sewer lateral benefit fee is due. <br />6. Water Lateral Fees. The PERMITTEE is constructing its own lateral service lines; therefore no <br />water lateral benefit fee is due. <br />7 Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. The 2017 Stormwater Management Fee applicable to the Plat <br />is $473 per residential unit. PERMITTEE must pay a Stormwater Management Fee of ($473 x <br />54 units = $25,542). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />8. Street Light Fee. The PERMITTEE is responsible for installation of street lights within the Plat. <br />As such, the PERMITTEE was required to create a street lighting plan and receive approval of <br />that street lighting plan from the CITY. PERMITTEE acknowledges that the final quantity of <br />street lights required may change pending final approval of the lighting plan by the CITY. The <br />PERMITTEE shall work directly with Connexus Energy for street light installation. <br />9. Street Light Operation and Maintenance Fee. The PERMITTEE is responsible for a Street Light <br />Operation and Maintenance Fee associated with lighting of public rights of way. PERMITTEE <br />must pay a Street Light Operation and Maintenance Fee of Two Hundred and Ninety Four Dollars <br />and No Cents ($294.00) per light ($294 x 5 lights = $1,470). As of February 1, 2017, Connexus <br />
The URL can be used to link to this page
Your browser does not support the video tag.