Laserfiche WebLink
energy no longer creates a street lighting plan for final plats. As such, the PERMITTEE submitted <br />a street lighting plan to the CITY. The PERMITTEE acknowledges that these fees are estimates. <br />The rate in effect when the Plat is recorded will be collected. <br />10. Lower Rum River Watershed Management Organization (LRRWMO) Infiltration Payment in Lieu <br />of Construction. The LRRWMO requires that the project infiltrate the first one (1) inch of rainfall <br />in order to reduce runoff entering the stormwater system. However, the project is located within a <br />ten (10) year capture zone for a public water supply well that does not allow infiltration. The <br />project must contribute to a regional system. Based on the amount of impervious surface, the <br />PERMITTEE is responsible for a payment $150,000.00 <br />