Laserfiche WebLink
specified in the contract documents with an approximate flow of 2,000 gpd. The Contractor shall <br />inspect the system daily when in operation, perform any needed maintenance, and provide daily <br />reports to the Engineer related to system operations. <br />The means and methods of temporary pumping shall be approved by the Engineer prior to <br />installation of any components. The contractor shall assume that permanent power will be available <br />at the site by December 1, 2017. <br />The City reserves the right to delete this item from the contract based on the actual need for the <br />system." <br />1.4 PLAN SET <br />1. REPLACE Sheet G0.02 with the attached Sheet G0.02 - Tabulations <br />1.5 ATTACHMENTS <br />1. Section 00410 — Bid Form, Bidding Schedule Pages 00410-4-5. <br />2. Sheet G0.02 - Tabulations <br />1.6 CERTIFICATION <br />I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly <br />Licensed Professional Engineer under the laws of the State of Minnesota. <br />By:—:3 <br />Kevin P. Kielb, P.E. <br />License No: 23211 <br />Date: 10/02/2017 <br />****END OF ADDENDUM**** <br />City of Ramsey - R16.114473 <br />2017 Puma Street Utility Improvements <br />ADDENDUM <br />PAGE 00910-2 <br />