• Soil -stained green or black, or with dark, oily appearance, or any unusual soil color or texture <br />• A rainbow color (sheen) on surface of water or soil <br />B. If encountered, the Contractor shall allow a minimum of 72 hours for the Owner to investigate the potential <br />contamination and determine the necessary steps for remediation and/or removal, if any. <br />C. Upon request, if contaminated soil is unexpectedly encountered and confirmed by the Owner's Environmental <br />Consultant, the Contractor shall stockpile the contaminated soil on 6-mil polyethylene sheeting and cover with <br />6-mil polyethylene sheeting that is secured in place and bermed to prevent run on/run-off. This work shall be <br />completed for an additional negotiated price or in the event that the cost cannot be mutually agreed upon the <br />Contractor's fee shall be determined in accordance with Paragraph 12.01.C. of the Standard General <br />Conditions of the contract. <br />D. If necessary, the Owner may negotiate with the Contractor to determine a mutually agreed upon price for <br />removal and/or remediation of contaminated soil, contaminated water and/or buried waste. If no such price <br />can be mutually agreed upon, the Contractor shall allow the Owner engage the services of a third party to <br />perform the necessary removal and/or remediation and no additional compensation will be due to the <br />Contractor provided that it does not significantly affect the progress of the work. <br />3.07 SITE RESTORATION <br />A. After completion of demolition and removal, the site shall be restored to a safe, stable condition. <br />B. Depressions from all removals shall be backfilled, compacted and graded using on -site soils as fill material in <br />accordance with Section 3122 00. <br />C. Final graded slopes shall be in accordance with the Site Restoration Plan. <br />3.08 METHOD OF MEASUREMENT <br />A. Building Demolition and Removal including removal of all interior and exterior materials, footings, all <br />pavement, curb and gutter, sidewalks, parking lot lights, sanitary sewer service pipe, water service pipe, storm <br />sewer pipe, signs and foundations, trees and other items as described above and indicated on the plans, will <br />be measured as a single lump sum quantity. <br />3.09 METHOD OF PAYMENT <br />A. Payment for the Building Demolition and Removal item at the Contract lump sum price shall be compensation <br />for all costs of the work described above. <br />Payment will be made on the basis of the following schedule: <br />Item Unit <br />Building Demolition and Removal Lump Sum <br />END OF SECTION <br />Division 2 — Existing Conditions <br />DV2-3 <br />