Laserfiche WebLink
D. If applicable, the asbestos -related work shall be performed by a Contractor or Sub -Contractor licensed or <br />certified by the commissioner under Minnesota Statutes sections 326.70 to 326.81 and the Contractor shall <br />provide a copy of that license or certification to the Owner. Further, if applicable, the Contractor shall prepare <br />a project -specific asbestos project plan in accordance with all applicable laws and regulations and adhere to <br />said plan. <br />E. The sign posts located at the Highway 101 Sunfish Lake Boulevard and footings shall be removed. <br />F. On -Site crushing will not be allowed. <br />3.02 REMOVAL <br />A. The Contractor shall completely remove the buildings and all of their internal and external components, <br />including steps, stoops, sidewalks, floors and footings. The Contractor shall also remove the parking lots, <br />concrete curb and gutter, trees, bushes, driveways, signs and foundations, and all other miscellaneous site <br />improvements as discussed herein and as shown on the plans. <br />3.03 UTILITIES <br />A. Telephone, electric power and other wire services, and gas service pipes will be disconnected by the utility <br />owners outside the buildings and all fixtures belonging to such utility companies will be removed by them. <br />Contractor shall remove all other piping and fixtures. <br />B. Remove sanitary sewer service pipe, water service pipe and storm sewer pipe as shown on the plans. Cap at <br />sewer and water mains per CEAM Standards and in accordance with the details as shown in the plans. <br />3.04 DISPOSAL OF MATERIALS AND DEBRIS <br />A. All materials removed and all debris resulting from the removal operations, shall become the property of the <br />Contractor and shall be removed from the site and disposed of in accordance with all City, Federal and State <br />Laws and regulations. <br />B. Under no circumstances shall crushed material, or products generated from the crushed material of the <br />building demolition, be used on -site as fill. <br />3.05 DUST CONTROL <br />A. The Contractor must take steps as necessary to control the dust during all building demolition and removal <br />operations. If necessary, water is available from the fire hydrant located on the site and may be purchased <br />from the City of Ramsey. The Contractor must supply his own water meter with backflow preventer to the <br />satisfaction of the Owner. Fees for water usage shall be paid separately by Contractor to the City of Ramsey in <br />accordance with the City's 2017 Fee schedule. <br />3.06 CONTAMINATED SOIL AND BURIED WASTE <br />A. In the event that contaminated soil and/or buried waste is unexpectedly encountered during the progress of <br />the work, the Contractor shall immediately cease work and secure the area. Work outside the vicinity of the <br />discovery area may continue provided that the area of potential contamination is secure. The Contractor shall <br />immediately notify the Owner. Indicators of potentially contaminated soil, groundwater or surface water <br />include: <br />• Odor including gasoline, diesel, creosote, mothballs, or other chemical -like odor <br />Division 2 — Existing Conditions <br />DV2-2 <br />