My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/12/15 & 02/17/15 Strategy Session - 02/12/2015
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2015
>
Agenda - Council Work Session - 02/12/15 & 02/17/15 Strategy Session - 02/12/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:00:39 PM
Creation date
10/31/2017 1:00:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Title
02/12/15 & 02/17/15 Strategy Session
Document Date
02/12/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CO <br />0 <br />0 <br />-h <br />Three - Year Strategic Action Plan <br />Streamlining internal <br />processes <br />Maximizing consultants' <br />accountability <br />73 <br />71 <br />70 <br />69 <br />68 <br />rn <br />0 <br />0) <br />en <br />64 <br />Determine Personnel Committee related work processes that need <br />to be redesigned <br />Increase safety operations by reviewing safety policies and <br />resuming Safety Committee meetings <br />Resume Labor Management Committee meetings twice a year <br />Maximize meeting effectiveness by developing an agenda template <br />that includes purpose, timeframes, responsible parties, and <br />outcomes <br />Study and develop a centralized licensing center <br />Train staff on process design /redesign of work processes <br />Consider Shared Inspection Services with adjacent communities <br />Streamline a centralized permitting center <br />Implement ePermit system <br />and file system library procedure <br />Design a seamless development process <br />Fully vet proposals, scrutinize work product, and conduct post - <br />project evaluations <br />Develop and implement a regular citizen survey <br />The Personnel <br />Committee was <br />eliminated in 2014. <br />A Labor Management <br />Committee has been <br />formed and is <br />addressing safety as <br />part of duties. <br />Ongoing <br />Effort <br />2015 project <br />2015 project <br />2015 project <br />2015 project <br />Needs a new software <br />package, currently <br />under review. <br />Ongoing <br />Citizen survey <br />completed in 2014 <br />• Enhanced HR processes <br />• Achieved time savings of Mayor /City <br />Council <br />• Achieved X percent of cost savings <br />• Streamlined safety policies <br />• Decreased work accidents by X percent <br />• Conducted highly effective and efficient <br />meetings <br />• Implemented a highly efficient/effective <br />licensing process with metrics <br />• Comprehensive software solution (see <br />permit section) (2015) <br />• Acquired internal knowledge and ability to <br />redesign work processes <br />• Completed study (2014) <br />• Implementation of shared services (TBD- <br />2015) <br />• Implemented a highly efficient/effective <br />permitting process with metrics <br />• Implement work flow improvements (2014) <br />• Need comprehensive software solution to <br />truly centralize and streamline process <br />(2015) <br />• Include Fire Department Permits in normal <br />permit process (2014) <br />• Implemented a seamless development <br />process driven by customer requirements <br />• Include Economic Development programs <br />in already completed materials (2014) <br />• Need comprehensive software solution <br />• Reduced or eliminated change orders on <br />consultants contracts/ <br />construction contracts <br />• Implemented Lessons Learned <br />• Collect metric feedback for approved <br />Balanced Scorecard <br />CO <br />0 <br />0 <br />-h <br />Three - Year Strategic Action Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.