Laserfiche WebLink
10/31/2017 09:12 AM <br />Add a BMP table listing the BMP's used on the project, the proposed quantity and the sheet <br />where installed. <br />Under inspections add note: "Email inspection reports to City after each inspection. Submit full <br />set of inspection reports prior to project close out." <br />Under temporary erosion control change "14 days" to "7 days" in all locations. <br />Under project closeout add note:"City must approve Notice of Termination before it is submitted." <br />Final Plans <br />Autocad drawings and pdfs of the final approved plans must be submitted prior to the <br />pre -construction meeting. The submittal must include the pen setting files for full size and <br />reduced size drawings. <br />As -built drawings and pdfs must be submitted after the 2nd lift of bituminous is installed. <br />0 Replies <br />20 - Street Alignment <br />Created by: Len Linton <br />On: 10/12/2017 04:25 PM <br />The western entrance must align with the exisiting street on the north side of Alpine Drive. <br />0 Replies <br />21 Traffic Management <br />Created by: Len Linton <br />On: 10/12/2017 04:27 PM <br />A traffic study will be required for this plat. The Study must also look at the visibility from the east <br />intersection. <br />0 Replies <br />22 Utility Connection <br />Created by: Len Linton <br />On: 10/12/2017 04:29 PM <br />An easement will be required for connecting to Municipal Sewer and Water. This will require <br />removing lots. <br />0 Replies <br />Page 6 <br />