My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 11/09/2017
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2017
>
Agenda - Parks and Recreation Commission - 11/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:54:05 PM
Creation date
11/3/2017 12:57:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
11/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/31/2017 09:12 AM <br />Utility Plan: <br />Symbols in the legend must match the plan view. <br />Specify the connection type and location to connect to existing. <br />Profiles are not required for preliminary plat. <br />Street Plan: <br />Urban streets shall be 32 ft Back to back with concrete curb and gutter. <br />Symbols in the legend must match the plan view. <br />A site specific typical street section is required. <br />Stormwater Calculations <br />This project will require a permit from the Lower Rum River Watershed Management <br />Organization (LRRWMO). The LRRWMO board will not consider the permit until the project has <br />received preliminary plat approval. The LRRWMO application requires city acknowledgement. <br />Work with staff to coordinate timing of the application submittal. <br />The LRRWMO requirements are infiltration of the first 1" of runoff from new impervious surfaces, <br />rate control for the 2, 10 and 100 year events and water quality improvement with removal of <br />60% total phosphorus and 90% total suspended solids. <br />Infiltration basins must be designed to drain down within 48 hours. If the basin is joined with the <br />stormwater pond, the infiltration basin area must be dry 48 hours after a 100 year storm. <br />The removal efficiencies must be documented by submittal of an approved model such as P-8, <br />MIDS Calculator or MPCA spreadsheet. The complete documentation must be submitted, not <br />just the output summary tables. <br />The City will administer the storm water management requirements of the permit. <br />A 16.5 ft easement is required around all infiltration basins and stormwater ponds. <br />Storm sewer pipe sizing calculations must be submitted for the 10 year storm. <br />Casting information must match detail STO-4. <br />0 Replies <br />19 - Engineering Final Plat <br />Created by: Len Linton <br />On: 10/12/2017 09:01 AM <br />The Final Plat submittal must include these items. <br />Storm sewer shown on Santiary Sewer and Water Plans shall be in a lighter pen. The same is <br />true for Storm Sewer and Street plans, with the Sanitary Sewer and Water in a lighter pen. <br />Centerline grades will be required on all profile sheets (Sanitary Sewer and Water, Storm Sewer <br />and Street) where the pipes are in the Right of Way. <br />Centerline Stationing shall be shown on all profile sheets except Storm Sewer outside of ROW. <br />Individual custom curb ramp details are required for each pedestrian ramp. The MNDOT 6 set <br />sheet must be included on the detail sheets and followed in the custom curb ramp details. <br />The following comments apply to the SWPPP document. <br />Show the 1 mile radius on the map. <br />The Trott Brook is considered a Special water and must be called out on the map and in the <br />table. <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.