My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/01/1993
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1993
>
Agenda - Planning Commission - 06/01/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:06:03 PM
Creation date
11/13/2017 11:31:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/01/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />:1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />CASE <br /> <br />REQUEST FOR SITE PLAN APPROVAL; CASE OF PARABODY <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />Parabody is requesting site plan approval for their proposed expansion to their existing <br />office/manufacturing/warehousing facility at 14150 Sunfish Lake Blvd. N.W. The following <br />items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />Site plan <br />Building plans <br />City Staff review letter dated May 27, 1993 <br /> <br />Observations: <br /> <br />The existing Parabody facility is 60,032 square feet in size; the proposed expansion is 69,888 <br />square feet. The expansion area would be used for warehousing purposes. The exterior facing <br />finish of the:sm~cture is proposed to be painted rock face concrete block, which is in compliance <br />with City Code architectural standards. <br /> <br />The proposal for the expansion is in compliance with City Code as it pertains to lot coverage, <br />setbacks, off-street parking, and landscaping. Although code only requires a minimum for <br />landscaping~ (establishment of turf) in side and rear yards, City Staff is suggesting that <br />consideratiola be given to the planting of conifer trees along the north and west property lines for <br />environmental reasons. <br /> <br />In accordance with City Code requirements, all of the proposed parking areas and loading areas are <br />proposed to be surfaced with bituminous. All of the newly paved areas are proposed to be finished <br />with concrete curbing except the driveway to the west loading door. ~ no additional expansions <br />are proposed to the west, then City Staff recommends that the west loading door drive also be <br />finished with concrete curb. <br /> <br />Recommendation: <br /> <br />City Staff recommends site plan approval. <br /> <br /> commission Action: <br /> <br />I <br />I <br /> <br />Motion to: <br />Recommend that City Council approve the site plan for the Parabody expansion contingent <br />upon compliance with City Staff review letter dated May 27, 1993. <br /> <br />I <br />I <br />I <br /> <br />Review Checklist: <br /> <br />P&Z: <br /> <br />City Administrator <br />City Engineer <br />Building Official <br />Parks/Utilities Coordinator <br /> <br />6/1/93 <br /> <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.