My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 11/09/2004
Ramsey
>
Public
>
Minutes
>
Council
>
2004
>
Minutes - Council - 11/09/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:55:47 PM
Creation date
11/30/2004 11:04:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
11/09/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion carried. <br /> <br />Case #8: <br /> <br />Request for Approval of the Development Permit Relating to the Final Site <br />Plan for the Developmen~ of Lot 1, Block 1, Ramsey Town Center 3rd <br />Addition; Case of Ramdanee, LLC <br /> <br />Community Development Director Frolik eXplained Case No. 8 and Case No. 9 will be reviewed <br />together, as the applicant has requested merging ithe two agreements into one document. The <br />document has been reviewed by City Attorney Goodrich, Assistant Public Works Director Olson, <br />and Sbingobee Development, and is down tO one unresolved item relating to stormwater. <br /> <br />Assistant Public Works Director Olson exPlained the reason they had initially put this in was due <br />to stormwater that is discharging not only into the southwest pond, which has been reconfigured, <br />but also into the Mississippi Rive?. The condition of the final plat approval was that all lots <br />subject to final plat approval within TOwn Center shall have pretreatment in Best Management <br />Practices to try to infiltrate the water and treat the Water quicker than what generally happens in a <br />regional treatment system. In the case of Ramsey Town Center 2nd Addition, D. R. Horton, it <br />was decided to utilize a rain garden. That has not exactly been proven in staff's opinion, but it <br />was determined to give it a try. He explained the issue is basically that Shingobee Development <br />has some concern with the stormceptor not only handling this site, but also adjacent runoff from <br />the county road upgrades that are necessary as part of the final plat that was approved. He stated <br />staff does not care who pays for the improvement, but the City should not have that <br />responsibility. <br /> <br />Greg Voss, representative of Shingobee Development, stated the stormceptor came to their <br />attention this afternoon for the first time as an engineering drawing. The biggest concern is the <br />design and redesign of the storm Pond was to create a water treatment process to create better <br />water quality, along with creating more density and tax base, and to accomplish both by <br />redesigning it. He stated 50 percent or more of the water that comes into the pond comes from <br />off of the RTC plat through the property to the West of Armstrong Boulevard. They have a <br />concern that this is being addressed for their third addition plat as their sole responsibility to treat <br />all that water. There are actually three pipes thatflow into the pond. He stated he would like an <br />opportunity of finding a better resolve for that. Shingobee Development does believe in water <br />quality and in their design there are catch basins and oil separators throughout the plat. He is a <br />little off guard and does not have a handle on this Stormceptor, but he does not feel now that this <br />plat is responsible for all the stormceptor for all: of the water offsite. He stated their plat only <br />generates approximately 30 percent:of the water gOing into that pond. <br /> <br />Mayor Gamec asked if this could be approVed contingent on the Engineer Agreement. He noted <br />there is drainage that will come from several different areas, <br /> <br />Assistant Public Works Director Olson indicated he understands the concern of Ramsey Town <br />Center 3rd Addition. His thoughts are that the agreement at the time the final plat was signed was <br />that there would be ponding and water qualitY treatment for all of the improvements necessary as <br />part of the final plat approval, those being county road improvements. The ponding will all be <br /> <br /> City Council/NOvember 9, 2004 <br /> Page 20 of 31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.