My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 11/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:39:23 PM
Creation date
11/27/2017 9:25:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
686
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations: <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive, regular pavement <br />maintenance treatments are performed during the life of the improvements. <br />Developed properties along the project corridor may have private irrigation systems. Impacts to these systems may <br />occur when existing bituminous curb and gutter is replaced with concrete curb and gutter. Staff will notify property <br />owners in writing of the pending construction as far in advance of construction as possible to allow them time to <br />move their irrigation system components out of the construction area, after which they may replace the components <br />in their original locations. <br />Public Comment <br />On November 1, 2017, Staff conducted a Public Information Meeting from 5:30 - 7:10 pm at City Hall. Notices for <br />this meeting were mailed to all benefiting property owners. Eleven (11) property owners attended the meeting. The <br />meeting was conducted as an open house forum, with Staff responding to questions one-on-one from 5:30 — 6:05 <br />pm, and again from 6:50 — 7:10 pm. A formal presentation was provided by Staff from 6:05 — 6:50 pm, which <br />addressed all aspects of the project including project purpose, scope, and schedule, existing conditions, proposed <br />improvements, estimated project costs, proposed funding sources, including special assessments, and a primer on <br />the Public Hearing. Numerous comments were received during this meeting as summarized below. <br />Similar to the other two meetings, one of the main comments was that it is difficult for property owners to pay <br />special assessments, especially when they are as high as the assessment being proposed with this project. Property <br />owners generally do not budget for assessments. Special assessments also make it difficult to sell your property. In <br />general, those in attendance were opposed to paying special assessments and felt these projects would be better <br />funded through the general fund. <br />Attendees also questioned the addition of concrete curb and gutter, noting that the existing bituminous curb has <br />been in place for 28 years and is not falling apart yet. Staff responded that while bituminous curb exists on <br />numerous streets throughout the City, the observed life expectancy is typically much less than that of concrete curb <br />and gutter, and that concrete curb and gutter better directs snow plow drivers increasing safety and preventing <br />damage to sod, mailboxes, landscaping, irrigation system components, etc. Concrete curb and gutter also better <br />directs drainage along the edges of streets and driveways, and does not degrade over time as bituminous gutters do. <br />Another common comment was that adding concrete curb and gutter would be completely out of context for this <br />neighborhood. <br />Another question received was why the City is not paving gravel streets first. Why spend money on streets that are <br />already paved when other streets are not paved yet? Staff noted that gravel roads do not fail in a similar manner as <br />paved roads and are therefore not as high a priority as paved roads when it comes to maintaining all 180 miles of <br />public roads in the City. <br />Another question raised was what guarantee do the property owners who are being assessed for this work have that <br />the new street will be maintained properly to protect their investment? Several property owners are concerned about <br />this based on the lack of previous maintenance completed on these streets after they were first paved. The property <br />owners asked what the City's plan is for maintaining these and other streets throughout the City. Staff responded <br />that current Staff and City Council are committed to maintaining the public streets, as evidenced by the $500,000 <br />that is budgeted annually for sealcoating to help proactively maintain public streets, as well as the 5-year Street <br />Reconstruction and Overlay Bond program. The property owners agreed this is a good start, but they are still <br />concerned that this will change over time as Council members change. <br />Questions were also posed regarding property owner's rights for opposing assessments. Staff briefly discussed <br />Chapter 8 of the City Charter, including the right to petition against a project. One resident requested a petition <br />form template, which was emailed to them the following day, along with a link to the City Charter on the City's <br />web site. <br />Attached is a copy of 3 comment cards received during the Public Information Meeting containing additional <br />information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.