Proposed improvements include removing existing bituminous curb and replacing with B618 concrete curb and <br />gutter, and reconstructing the existing bituminous pavement section using the Full Depth Reclamation (FDR) <br />process. The FDR process involves milling the entire existing bituminous pavement section, along with an inch or <br />more of existing underlying aggregate base. This reclaim material would then be spread over the reshaped and <br />compacted subgrade between the concrete curb and gutter, and then the top 3'/2 inches of reclaim material would be <br />removed and hauled off site. Then 3'/2 inches of new bituminous pavement would be installed over the remaining <br />compacted reclaim material, resulting in a 7-ton pavement design, which is standard for residential streets. <br />The existing storm sewer system is proposed to be improved to meet City design standards. This will include <br />additional catch basins placed along the roadway, and replacing existing bituminous flumes, where possible. <br />The engineer's opinion of probable costs for completing the proposed improvements on the North Forty as outlined <br />in this report is $518,685.13. Estimated costs include 5% contingency costs plus 23% indirect costs for <br />administrative, engineering, finance and legal costs. A summary of the engineer's opinion of probable costs is <br />included inAppendix B of the Feasibility Report. <br />Fifteen (15) parcels have been identified as receiving special benefit from the improvements. These parcels are <br />identified in the preliminary Assessment Map and Roll, which are included in Appendix C of the Feasibility Report. <br />Staff recommends assessing 25-percent of eligible improvement costs equally across these 15 parcels using the "per <br />lot" assessment method. This results in a proposed preliminary assessment rate of $8,644.75 per assessable parcel. <br />Staff recommends ordering a special benefit consultation report for this project to verify the proposed assessment <br />amount will not exceed the benefit to the properties. If the report concludes the benefit to the properties is less than <br />the proposed preliminary assessment rate, Staff will then propose to lower the assessment rate accordingly during <br />the Assessment Hearing, which is scheduled for October 9, 2018. If the report verifies the assessment rate as <br />proposed is justified, Staff will propose to adopt the final assessment roll using the rate as preliminarily proposed. <br />Five soil borings were completed by Braun Intertec to assist with the preparation of this report. Pavement design <br />recommendations were offered by Braun Intertec, and Staff considered and incorporated to varying degrees while <br />preparing the report. Ground Penetrating Radar (GPR) was conducted on all street segments within the project. The <br />GPR identifies existing bituminous pavement and aggregate base thicknesses, and is used to help staff determine <br />the appropriate treatment. Copies of Braun Intertec's GPR results and Geotechnical Exploration report are included <br />inAppendix C of the Feasibility Report. <br />This improvement project, which is listed in the City's current 10-year Capital Improvement Plan, is proposed to be <br />funded using a combination of special assessments to benefiting properties, street reconstruction bond proceeds, <br />and storm sewer funds. <br />This project would best be constructed in conjunction with the River's Bend Street Reconstructions and the <br />Stanhope Terrace Street Reconstructions projects, is necessary, feasible, and cost-effective from an engineering <br />standpoint, and can be constructed as proposed herein. <br />Notification: <br />In accordance with State Statutes, the attached Notice of Public Hearing was published in the Anoka Union Herald <br />on October 27 and November 3, 2017, and Public Hearing Notices were mailed to all benefiting property owners <br />identified in the preliminary assessment roll. <br />Observations/Alternatives: <br />