Laserfiche WebLink
Item <br />No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />18-01 THE NORTH FORTY STREET RECONSTRUCTION <br />Preliminary Engineer's Estimate 10/19/2017 <br />STREET CONSTRUCTION <br />Description Unit Estimated Unit Cost <br />Quantity <br />MOBILIZATION LS 1 $16,000.00 <br />REMOVE SEWER PIPE - STORM LF 100 $20.00 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT SF 210 $3.00 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT SY 145 $8.00 <br />REMOVE MANHOLE OR CATCH BASIN EA 1 $400.00 <br />REMOVE BITUMINOUS FLUME EA 3 $500.00 <br />SAWING CONCRETE PAVEMENT - FULL DEPTH LF 34 $6.00 <br />SAWING BITUMINOUS PAVEMENT - FULL DEPTH LF 264 $3.00 <br />SALVAGE MAIL BOX SUPPORT EA 14 $50.00 <br />TEMPORARY MAIL BOX CLUSTER EA 2 $400.00 <br />COMMON EXCAVATION (EV) CY 400 $12.00 <br />SUBGRADE PREPARATION RDST 28 $200.00 <br />WATER MGAL 50 $30.00 <br />AGGREGATE BASE CLASS 5 MODIFIED (CV) CY 1,400 $20.00 <br />BITUMINOUS PAVEMENT RECLAMATION - FULL DEPTH SY 10,048 $2.00 <br />HAUL BIT PAVEMENT RECLAMATION (LV) CY 1,350 $11.00 <br />BITUMINOUS MATERIAL FOR TACK COAT GAL 611 $3.00 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA340C) (1.5") TON 720 $68.00 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (SPNWB330C) (2.0") TON 960 $60.00 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA340C) DRIVEWAYS (2") TON 16 $68.00 <br />CONCRETE CURB & GUTTER DESIGN B618 (HE) LF 5,231 $13.00 <br />6" CONCRETE DRIVEWAY PAVEMENT (HE) SY 25 $55.00 <br />7" CONCRETE VALLEY GUTTER (HE) SY 45 $80.00 <br />BITUMINOUS CURB LF 300 $10.00 <br />LANDSCAPE RESTORATION LS 1 $10,000.00 <br />INSTALL MAIL BOX SUPPORT EA 14 $50.00 <br />TRAFFIC CONTROL LS 1 $3,000.00 <br />SILT FENCE, TYPE MS LF 100 $3.00 <br />STORM DRAIN INLET PROTECTION EA 11 $200.00 <br />FERTILIZER TYPE 3 LB 15 $3.50 <br />COMMON TOPSOIL BORROW (LV) CY 500 $30.00 <br />SEED MIXTURE 33-261 LB 5 $10.00 <br />SODDING TYPE LAWN SY 3,450 $5.00 <br />EROSION CONTROL BLANKET CATEGORY 3 SY 267 $3.00 <br />SEEDING ACRE 0.06 $4,000.00 <br />TOTAL STREET CONSTRUCTION COST <br />5% CON77GENCY COST <br />23% INDIRECT COST <br />TOTAL STREET PROJECT COST <br />Cost <br />Extension <br />$16,000.00 <br />$2,000.00 <br />$630.00 <br />$1,160.00 <br />$400.00 <br />$1,500.00 <br />$204.00 <br />$792.00 <br />$700.00 <br />$800.00 <br />$4,800.00 <br />$5,600.00 <br />$1,500.00 <br />$28,000.00 <br />$20,096.00 <br />$14,850.00 <br />$1,833.00 <br />$48,960.00 <br />$57,600.00 <br />$1,088.00 <br />$68,003.00 <br />$1,375.00 <br />$3,600.00 <br />$3,000.00 <br />$10,000.00 <br />$700.00 <br />$3,000.00 <br />$300.00 <br />$2,200.00 <br />$52.50 <br />$15,000.00 <br />$50.00 <br />$17,250.00 <br />$801.00 <br />$240.00 <br />$334,084.50 <br />$16, 704.23 <br />$80,681.41 <br />$431,470.13 <br />Feasibility Report <br />The North Forty Reconstructions <br />City of Ramsey Project No. 18-01 <br />