Laserfiche WebLink
Item <br />No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />STORM SEWER CONSTRUCTION <br />Description <br />U 1'1LITY DEWATERING <br />GEOTEXTILE FABRIC TYPE IV <br />CONCRETE FLUME <br />15" RC PIPE APRON <br />18" RC PIPE APRON <br />TRASH GUARD FOR 15" RC PIPE APRON <br />TRASH GUARD FOR 18" RC PIPE APRON <br />15" RC PIPE SEWER, DESIGN 3006 CLASS III <br />18" RC PIPE SEWER, DESIGN 3006 CLASS III <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 2X3 CATCH BASIN <br />CASTING ASSEMBLY <br />INSTALL CASTING <br />ADJUST FRAME AND RING CASTING <br />RESET CATCH BASIN CASTING <br />RANDOME RIP RAP CLASS III <br />Unit Cost <br />$1,000.00 <br />$3.50 <br />$200.00 <br />$500.00 <br />$750.00 <br />$300.00 <br />$400.00 <br />$35.00 <br />$40.00 <br />$425.00 <br />$1,200.00 <br />$550.00 <br />$250.00 <br />$350.00 <br />$1,000.00 <br />CY 12 $150.00 <br />TOTAL STORM SEWER CONSTRUCTION COST <br />5% CONTINGENCY COST <br />23% INDIRECT COST <br />TOTAL STORM SEWER PROJECT COST <br />Unit <br />LS <br />SY <br />EA <br />EA <br />EA <br />EA <br />EA <br />LF <br />LF <br />LF <br />EA <br />EA <br />EA <br />EA <br />EA <br />Estimated <br />Quantity <br />1 <br />50 <br />1 <br />1 <br />1 <br />1 <br />1 <br />340 <br />412 <br />45 <br />2 <br />10 <br />10 <br />10 <br />1 <br />PRELIMINARY ENGINEER'S ESTIMATE SUMMARY <br />TOTAL STREET PROJECT COST $431,470.13 <br />TOTAL STORM SEWER PROJECT COST $87,215.00 <br />TOTAL ESTIMATED PROJECT COST $518,685.13 <br />STREET RECONSTRUCTION AND OVERLAY PROGRAM BONDS $323,602.60 <br />STORM WATER UTILITY FUND $65,411.25 <br />SPECIAL ASSESSMENTS $129,671.28 <br />Cost <br />Extension <br />$1,000.00 <br />$175.00 <br />$200.00 <br />$500.00 <br />$750.00 <br />$300.00 <br />$400.00 <br />$11,900.00 <br />$16,480.00 <br />$19,125.00 <br />$2,400.00 <br />$5,500.00 <br />$2,500.00 <br />$3,500.00 <br />$1,000.00 <br />$1,800.00 <br />$67,530.00 <br />$3,376.50 <br />$16,308.50 <br />$87,215.00 <br />Feasibility Report <br />The North Forty Reconstructions <br />City of Ramsey Project No. 18-01 <br />