My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative 1: Surface Water Supply. <br />With this alternative, the following key improvements are required. <br />Phase 1.- Construct a 9.6 mgd surface water treatment facility. Facility will need <br />to be on-line by 2019 to meet community water demands. <br />Estimated cost: $32,000,000. <br />Phase 2 - Construct 2.4 mgd surface water treatment facility expansion. <br />Expanded capacity required by 2025 to meet community water demand. Facility <br />includes additional membrane filters, chemical feed and clarification facilities. <br />Estimated Cost: $4,250,000. <br />Total capital investment for this alternative is estimated to be $36,500,000. <br />Alternative 2: Ground Water Supply. <br />With this alternative, additional ground water wells, and a ground water treatment facility <br />would be required. Key improvements are as follows: <br />Phase 1 - Construct 9.6 mgd ground water treatment facility. Facility to be on- <br />line by 2019. Estimated Cost: $24,000,000. <br />Phase 2 - Construct Well 9. Well to be on-line by 2019. Estimated Cost: <br />$900,000. <br />Phase 3 - Construct Well 10. Well to be on-line by 2022. Estimated Cost: <br />$900,000. <br />Phase 4 - Construct 2.4 mgd ground water treatment facility expansion. Facility <br />to be on-line by 2026. Estimated Cost: $4,100,000. <br />Phase 5 - Construct Well 11. Well to be on-line by 2026. Estimated Cost: <br />$900,000. <br />Phase 6 - Construct Well 12. Well to be on-line by 2030. Estimated Cost: <br />$900,000. <br />Total capital investment for this alternative is estimated to be $31,700,000. <br />City of Ramsey, Minnesota — R13.104504 Page 5 <br />Comprehensive Water System Study Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.