Laserfiche WebLink
BRUCE JACOBSON <br />Landscape Architect <br />LHB Scope of Services + Fee <br />Project: Ramsey COR 'Lake Ramsey Commons' + 'Municipal Plaza' Schematic Design <br />Client: City of Ramsey <br />Primary Consultant: Bruce Jacobson (Project Number: BJLArch 16-0121) <br />Sub -Consultant: LHB, Inc. <br />Date: 12/5/2017 <br />Overview <br />The City of Ramsey, through Mark Riverblood, their Parks and Public Works Assistant Superintendent, <br />invited Bruce Jacobson to submit this proposal to provide Landscape Architectural consulting for the <br />above referenced project. Based on the conceptual design study for 'Lake Ramsey Commons' and <br />'Municipal Plaza' described in the COR Parks + Public Places — Public Realm Framework document dated <br />January 2016, he has outlined the specific tasks needed to translate existing concept ideas into Park <br />Programming/Schematic Design recommendations. This work will help guide near -term <br />excavation/grading operations needed to prepare both sites: the 'Municipal Plaza' site as it relates to <br />the proposed adjacent development, and the 'Lake Ramsey Commons' site as it relates to additional <br />(future) park improvements at that location. <br />Scope of Services <br />Bruce will facilitate a series of workshops with Mark Riverblood, and other City Department Leaders (as <br />directed by Mark), to complete further refinements to existing Lake Ramsey Commons and Municipal <br />Plaza Concepts according to the tasks, meetings and deliverables outlined in the following Work Plan: <br />Task 1— Project Start Up (concurrent with Task 2) <br />• Confirm study area <br />• Create base map <br />• Confirm outcomes / level of detail / deliverables <br />Deliverables: Summary Memorandum (objectives + final deliverables) <br />Task 2 — Preliminary Design Program (concurrent with Task 1) <br />• Confirm use areas / user groups <br />• Confirm desired amenities / facilities <br />• Confirm infrastructure needs <br />Meetings: 1 Consultant Team; 1 City Staff Workshop (design program) <br />Deliverables: Summary Memorandum (preliminary design program) <br />Task 3 — Refined Concept <br />• Quick sketch studies; confirm relative size / location / connections <br />• Confirm overall character / materials options <br />• Provide precedent project images to illustrate ideas <br />• Facilitate discussion to synthesize design ideas into Preferred Concept Plan <br />• Facilitate discussion to define realistic project phases and Final Phasing Plan <br />Meetings: 1 Consultant Team; 1 City Staff Workshop <br />Deliverables: Summary Memorandum (concept studies + Preferred Concept Plan + Phasing Plan) <br />