My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 — Schematic Design Documentation <br />• Work with selected Civil Engineer to translate Preferred Concept Plan into construction <br />document format (AUTOCADD Schematic Design plan set to be prepared by Civil Engineer) <br />• Prepare preliminary design studies and 'draft' Schematic Design Documents (format and level of <br />detail as needed to illustrate/clarify design intent for Civil Engineering) including: <br />+ Preliminary Layout / Dimension Plan <br />+ Preliminary Grading / Drainage Plan (with stormwater management components) <br />+ Preliminary and Final Planting Plan (detailed plant schedule as needed) <br />+ Design Details (as needed) <br />Meetings: 1 Consultant Team; 1 City Staff Workshop <br />Deliverables: Summary Memorandum (Preliminary Schematic Design Documents) <br />Note: Bruce Jacobson and LHB will have a lead role in defining overall park concept and specific design <br />direction for each project element; we will work closely with City Staff and the selected Civil Engineer <br />to coordinate (and critique) production/translation of preliminary concepts into final Schematic <br />Design Documents as part of the Civil Engineer Scope of Service (outlined below) <br />Task 5 — Process Documentation + Final Report <br />• Provide all meeting summaries and other project/process information <br />• Provide paper and electronic copies of all presentations <br />• Prepare final Summary Slide Presentation of Schematic Design <br />Meetings: 1 Consultant Team; 1 City Staff Workshop <br />Deliverables: Final Report (meeting summaries, presentations) <br />Civil Engineer Scope (suggested outline — detailed scope defined by City of Ramsey) <br />The selected Civil Engineer (under separate contract and detailed Scope of Services) will be responsible <br />for translating all studies, plans, sections and other preliminary design drawings described above into <br />Schematic Design, construction document format including the following; <br />+ Preliminary and Final Layout / Dimension Plan <br />+ Preliminary and Final Grading / Drainage Plan (with stormwater management components) <br />+ Preliminary and Final Utility / Infrastructure Plan (as needed) <br />+ Design Details (as needed) <br />Specifics of the drawing set including confirmation of percentage level of completion to meet project <br />review, approvals and permitting requirements will be determined by City Staff as part of this process. <br />Project Schedule <br />We expect to complete our Scope of Services in 2 to 3 months, but depending on the level of <br />effort/amount of time required by selected Civil Engineer to complete the Civil Engineer Scope, some <br />coordination and critique meetings may extend beyond that time frame. <br />
The URL can be used to link to this page
Your browser does not support the video tag.