My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:40:04 PM
Creation date
12/13/2017 8:45:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1007
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lour 1111.1siion: To work together to reiposihty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session 7. 9. <br />Meeting Date: 12/12/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #17-12-316 Ordering Plans and Specifications for Improvement Project #18-05, Bunker Lake <br />Boulevard and Puma Street Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #17-12-316 ordering Plans and Specifications for <br />Improvement Project #18-05, Bunker Lake Boulevard and Puma Street Improvements. <br />Background: <br />The proposed improvements addressed within this case comprise the third project in a series of recent improvement <br />projects required to serve current and future developments within the immediate area with utilities and <br />transportation facilities. <br />In the fall of 2017, utility extension improvements were constructed along approximately 1,400-feet of Bunker <br />Lake Boulevard, east of Puma Street. These utility extensions were required to serve the Riverstone residential <br />development west of Puma Street, as well as a portion of the Bunker Lake Industrial Park development south of <br />Bunker Lake Bouelvard and east of Puma Street. This work is identified as Phase IA in the attached Future <br />Business Park Proposal completed by Bolton & Menk. <br />Construction is currently underway on utility extension improvements under Puma Street, north of Bunker Lake <br />Boulevard. These utility improvements will support a majority of the Riverstone residential development, as well as <br />all future commercial and residential development east of Puma Street, plus a small area of undeveloped land in the <br />Northfork development, west of the Riverstone development. The area that will be served by these utilities, with the <br />exception of the small Northfork area, is within the City's MUSA thereby requiring service by City sewer and <br />water. After the Puma Street utility improvements are complete, a temporary pavement section of reclaimed <br />pavement will be used for the winter. This work is identified as Phase 1B in the attached Future Business Park <br />Proposal. <br />Staff is now requesting Council authorization to prepare plans and specifications to complete the proposed roadway <br />improvements through Phases IA and 1B. Attached is a memo dated December 7, 2017 which provides detailed <br />information on the scope of the improvements and the costs required to prepare plans and specifications, as well as <br />costs to bid the plans and specifications. Further information on these costs are included in the memo dated July 27, <br />2017. <br />Notification: <br />Notifications are not required at this time, but will be required during future approvals for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.