Laserfiche WebLink
Sidewalks: Sidewalk will be required along the north side of 168th Lane NW to the new cul-de-sac bulb. A <br />portion of this sidewalk would extend beyond the boundaries of the Plat to connect back to Kamacite St NW. <br />The City is open to discussing cost allocations for that portion of sidewalk. <br />Utilities and Municipal Services: All new lots will be serviced with municipal utilities. The plans must show <br />the existing utility stubs for the existing house and clearly show that the existing home will connect to municipal <br />utilities as part of this project. <br />Grading and Drainage Plans: A permit from the LRRWMO will be required. There is a significant drainage <br />easement over a portion of the Property that is proposed to be vacated. While a memorandum has been <br />prepared outlining how this drainage will be accounted for, Staff has not had sufficient time to review that data <br />in great detail. Addressing this drainage issue will need to be resolved for this project to move forward. <br />The lower floor of each home must follow LRRWMO rules. Lowest floor must be at least three (3) feet above <br />the water table, two (2) feet above the 100-year event, and one (1) foot above emergency overflow. Distance <br />from ground water must be verified. See engineering review for more detailed grading and drainage comments. <br />Development Fees: Development Fees will be due with the Plat including, but not limited to, Park Dedication, <br />Trail Development, Storm water Management, Trunk Water and Trunk Sanitary Sewer, and Lateral Benefit <br />Charges for Sewer and Water (only applicable for Lots 4-5, Block 2). These fees are collected at the time the <br />Final Plat is recorded and at the rate in effect when the final plat is recorded. <br />Development Agreement: An executed Development Agreement will be required prior to releasing the plat <br />for recording. An engineer's estimate for public improvements will be required with the submitted final plat <br />Miscellaneous: Temporary construction easements will be needed from the property owners of the lots where <br />the existing cul-de-sac will be removed. See engineering review for more detailed comments. <br />