My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1981-1983 FILE #3
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1980-1989
>
Comp Plan 1981-1983 FILE #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 1:41:34 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
For Release: <br /> <br /> METROPOLITAN COUNCIL <br />300 Metro Square Building, Saint Paul, Minnesota 55101 <br /> <br />Business Item: B-6 <br /> <br />REPORT OF THE PHYSICAL DEVELOPMENT COMMITTEE <br /> Referral Report No. 81-243 <br /> <br />TO: Metropolitan Council <br /> <br />S UBJE CT: <br /> <br />City of Ramsey Comprehensive Plan Review <br />Metropolitan Council District No. 12 <br />Metropolitan Council Referral File No. 9040-2 <br /> <br />On May 27, 1982, the Physical Development Committee considered the attached <br />report on the comprehensive plan of the City of Ramsey. <br /> <br />The recom~nendations were adopted as follows: <br /> <br />That Ramsey be advised that: <br /> <br />A. This report constitutes the Council's official review required under <br /> the Metropolitan Land Planning Act. <br /> <br />~B. No plan modifications are required. <br /> <br />C. The Ramsey plan relates to metropolitan system plans as follows: <br /> <br />The plan is in conformance with the Transportation Policy Plan, <br />the Regional Recreation Open Space System, and the metropolitan <br />system plan for airports. <br /> <br />The plan is in conformity With the Metropolitan Council's system <br />plan for sewers in that it meets the planning requirements for <br />sanitary sewers and on-site system management. <br /> <br />Following the adoption of the plan by the city, Ramsey should <br />submit the comprehensive sewer plan portion to the MWCC for its <br />review. That plan should address the additional con~nents raised <br />by the MWCC. <br /> <br />The plan'appears generally compatible with the plans of adjacent and <br />affected units. Co~ents of a local nature have been raised by the <br />City of Anoka. These concerns should be worked out between the <br />cities. <br /> <br />E. The plan relates to other Metropolitan Development Guide chapters as <br /> follows; <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.