My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1978-1980 FILE #2
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1978-1980 FILE #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 2:36:27 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NORTHWEST STUDY A_REA <br /> <br />The northwest area includes the cities of Ramsey, Anoka, Champlin and portions of Maple <br /> <br />Grove, Brooklyn Park and Andover. There are ~wo t_reatment plants serving this area, one' <br /> <br />in Anoka serving Champlin and Anoka and the Metropolitan Plant in St. Paul which serves the <br />remainder of the urban area of these cities. There have been numerous previous planning reports <br />that have dealt wi~h this area even to the extent that the Council's Waste Management Policy <br />Plan includes a recommended project. However, as part of %he 208 plan the Council was <br />obligated to reexamine all the alternatives previously considered based on current informati6n. <br />New population and flow projections were developed for this are~ and a river model which could <br />address the impacts of various discharges on the river was also developed so this reexami- <br />nation was warranted. In regard to the Anoka interceptor which is c~rrently under design, <br />this sewer has been assumed to be completed and this study will not look at the pros and cons <br />of this sewer segment. Figure 1 shows the present sewer service area in ~is area for each <br />of these facilities. Sewered population and flow projections by treatment plan~ service area <br />are shown in Table 1. <br /> <br />Anoka Service Area <br /> <br /> TABLE 1 <br /> <br />Trea~ent Plan Service Area Pro~ections <br /> <br /> 1976 19.90 2000 <br />Sewer Flow Sewer Flow Sewer Flow <br />Po?. (m~d) Pop... (mgd) Pop. (mgd) <br /> <br />Anoka 13,000 1.59 15,000 1.95 15,000 2.03 <br />Champlin 3,200 .19 12,400 .79 17,000 1.20 <br />Ramsey 0 0 6,000 .8 1i,000 .91 <br /> 16,200 1.78 33,400 3.22 43,000 4.14 <br /> <br />MetroPolitan Service Area <br /> <br />Andover 1,100 .08 9,800 .75 13,000 1.04 <br />Brooklyn Park 32,000 2.55 48,000 4.06 58,000 5.06 <br />Maple Grove 9,500 .74 30,500 2.50 40,000 3.38 <br /> 42,600 3.37 88,300 7.31 111,000 9.48 <br /> <br />Anoka <br /> <br />The Anoka treat_merit plant is a secondary activated sludge process designed to treat 2.46 mgd. <br />The plant currently serves the cities of Anoka and Champlin. In about 1985 it is projected <br />that a portion of Ramsey will be sewered. Based on current flow projections for Anoka and <br />Champlin the existing plant will become hydraulically overloaded in 1984. The existing site <br />Ls also limited for future expansion so a new site approximately i mile upstream has been <br />chosen for future expansion of the Anoka facility. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.