My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1978-1980 FILE #2
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1978-1980 FILE #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 2:36:27 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />~.~y 30, 1978 <br /> <br />consult'ng <br /> <br /> ' al'vets'f 'ed ' <br />_en© neers nc, <br /> p.o. box j. osseo, minnesota 55369 r~ (612) 425-2181 <br /> <br />Honorable Mayor and City Council <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Anoka, Minnesota 55303 <br /> <br />Attention: Mr. William Goodrich <br /> <br />Gentlemen: <br /> <br />The purpose of this letter is to .update the City Council on the status of Ramsey's <br />comprehensive sewer planning effort as!it'relates to the planning conditions pro- <br />posed by the MetropolitanCouncil. Specifically, the Metropolitan Council staff <br />presented a memorandumat the May 22, 1978, City Councilmeeting outlining the <br />procedural steps that will be re~,iredrof Ramsey in order to precipitate the <br />planning and ultimate construction of the second. CAB interceptor connection for <br />Ramsey. According to that memorandum, the documentation needed from Ramsey is as <br />foll~s: <br /> <br />Expand the Urban Planning District Report to include timing and staging <br />of local sewer service within the 1990 urban service area. Sewer service <br />phasing should be consistent with Metro Council prOjected population of 6,000. <br />This can be accomplished by adding! exhibits to the Urban Planning District <br />report. <br /> <br />Revise Ramsey's Ccmprehensive Sewer Plan reflecting the second connection. <br />On the basis of verbal direction of Mr. Nereson, we have determined the <br />appropriate distribution of capacity between the Rum and Mississippi watershed. <br />areas, evaluated the impact of tb~ capacity allocations proposed for Ramsey by <br />the ~C consultant, questioned those capacity allocations to the MWCC staff <br />and received a formal con~itmant from the ~4CC staff of an increased capacity <br />allocation for the west connection' point. This has permitted the beginning of <br />the final design process for the Anoka portion of the CAB interceptor. This <br />has been done at a cost of $734.00~ <br /> <br />It will be recalled that the Ramsey Comprehensive Sewer Plan includes two c~pacity <br />alternatives -- one providing for complete develo~n~nt of the City at an average <br />population d¢_nsity of nine persons per"gross acre and the otherproviding for <br />complete development of the City at an average density of six persons per gross acre. <br />The cost differential between the two levels of service was slightly greater than <br /> <br />keith caswell jr. u darrell schneider ~J richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.