My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1978-1980 FILE #2
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1978-1980 FILE #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 2:36:27 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
consult'rig eng'neers d'vers'f'ed ' <br /> p.o. box j. osseo, minnesota 55369 Ln (612) 425-2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />Honorable Mayor and City Council <br />City of Ramsey <br />May 30, 1978 <br />Page 2 <br /> <br />one percent. <br /> <br />The capacity allocation now proposed to be provided in the CAB facility will <br />acconmodate saturated development of the urban planning area at normal urban <br />densities and for saturated develotx~_nt of the transitional area at an average <br />density of six persons per gross acre,iWith minimal excess capacity that oould <br />be used by the rural area. <br /> <br />The basis for evaluation of the CAB design capacity allocation has been an assumed <br />annual average sewage contribution of 7'0 gallons per capita as opposed to the 100 <br />gallons per capita assumed in the Ramsey Comprehensive Sewer Plan. <br /> <br />The 100 gallon per day assumption has .been reconmendedby the Mi~nesota Pollution <br />Control Agency for use in designing entirely new sanitary sewer systems with no <br />previous records of flow. Flows measured~throughoutthemetropolitanarea since <br />that report was prepared have shown values near 70 gallons per capita to reflect <br />the actual current contribution. : <br /> <br />In sunmary, the system capacity alternatives are: <br /> <br />Alternate Total PE* <br /> <br />Ave. Annual Flow <br /> <br />9 PE/Acre @ 100 GCD <br />(Plan I Ramsey CSP 1974) <br /> <br />148,195 14.82 MGD <br /> <br />6 PE/Acre @ 100 GCD <br />(Plan II Ramsey CSP 1974) <br /> <br />123,775 12.38 MGD <br /> <br />CAB CapacityAllocation <br />Saturated Development, Urban <br />Planning Area, 6 PE/Acre <br />Transition Area @ 70 GCD <br /> <br />112,429 7.87 MGD <br /> <br />* PE = Population Equivalent <br /> <br />keith caswell jr. u :darrell schneider uJ richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.