My WebLink
|
Help
|
About
|
Sign Out
Home
Comp Plan 1978-1980 FILE #2
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1970-1979
>
Comp Plan 1978-1980 FILE #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:33:25 AM
Creation date
12/9/2004 2:36:27 PM
Metadata
Fields
Template:
Engineering
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
consut'ng <br /> <br />engineers d'vers'f'ed ' <br /> p.o. box j. osseo, minnesota 55369 Lq (612) 425~2181 <br /> <br />civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />ttonorable Mayor and City Council <br />City of Ramsey <br />May 30, 1978 <br />Page 3 <br /> <br />A major decision that must be made by the City Council is the selection of one <br />of ~le hhree principal syste~n capaCity alternatives to be adopted as the Ramsey <br />Comprehensive Sewer Plan. <br /> <br />The impact of the M~CC capacity allocation upon the cost of the total trunk' sewer <br />system should be determined as the major element of the Comprehensive Sewer Plan <br />revision. The remaining elements of the revision should include: <br /> <br />Updating the costs of Plans I and II of the 1974 Plan to permit a valid <br />c~parison of those costs with the oost of the reduced system that ~.~uld <br />acconm~ate the ~DC capacity allocation. <br /> <br />2. Preparation of cost estimates of the facilities necessary to adapt the trunk <br /> sewer system to the second Ramsey Connection for all %hree plans. <br /> <br />3. Preparation of a new tabulation of :deSign data using the M~CC capacity <br /> allocation. <br /> <br />4. Preparation of new exhibits showing the reduced system and real.ignm~nt of <br /> the trunk sewer system to adapt the trunk system to the second Ramsey connection. <br /> <br />5. Reprint the 1974 report, print the revisions, bind the revised report into a <br /> single document and provide 50 copies of the revised plan. <br /> <br />Our estimated cost for t/~e remaining WOrk to fulfill the Metropolitan Council's <br />procedural requirement for both the Urban Plan and the Comprehensive Sewer Plan <br />is $4,680.00. (See attached breakdown) We would propose to perform this work on <br />an hourly basis at a cost not to excee~ $4,680.00. <br /> <br />With the completion of revisions to the Urban Plan and Comprehensive Sewer Plan, <br />the City should sutmtit those documants to the Metropolitan Council and ~tropolitan <br />Waste Control Con~ssion along with a resolution requesting a Waste Management <br />Policy Plan amendment to include a second Ramsey connection. <br /> <br />keith caswell jr. u darrell schneider ~:¢ richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.