|
BID ALTERNATES
<br />
<br /> PAY ESTIMATE #2
<br /> ELMCREST PARK
<br />UTILITY AND STREET IMPROVEMENTS
<br />IMPROVEMENT PROJECT NO. 04-20
<br />CITY OF RAMSEY
<br />
<br />BID SCHEDULE "d" - ADDITIONAL PATHS Bauerly Companies
<br />
<br /> Estimated - Used to
<br />Item 'Description Quantity Unit Price Contract Price Date Extension
<br />1 Common Excavation and Embankment 5,250 CY $ 1,80 $ 9,450.00 $
<br />2 Geotextile Fabric Type V 10,550 SY $ 0.94 $ 9,917.00 $
<br />3 Select Granular Borrow 3,950 CY $ 9.08 $ 35,866.00 $
<br />
<br /> 4 Modified Aggregate Base Class 5 2,750 TON $ 12119 $ 33,522.50 $
<br /> 5 Type LV4 Wearing Course 1,350 TON $ 32.92 $ 44,442.00 $
<br />
<br />Total Bid Schedule "D" - Additional Paths
<br />
<br />$ 133,197.50 $
<br />
<br />BID SCHEDULE "E" - ADDITIONAL PARKING LOT
<br /> Estimated ' Used to
<br />Item Description Quantib Unit Price Contract Price Date Extension
<br />
<br />1 Select Granular Borrow 1,000: CY $ 7.78 $ 7,780.00 1,000 $ 7,780.00
<br />2 Geotextile Fabric Type V 4,500~ SY $ 0.84 $ 3,780.00 3,240 $ 2,721.60
<br />3 Modified Aggregate Base Class 5 1,656 TON $ 8,68 $ 14,322.00 1756.3 $ 15,244.68
<br />4 Type LV4 Wearing Course 406 'TON $ 30.36 $ 12,144.00 $
<br />5 Type LV3 Non-Wearing Course 400; TON $ 29.09 $ 11,636.00 355.4 $ 10,338.59
<br />6 Bituminous Material for Tackcoat 18(] GAL $ 1.00 $ 180.00 $
<br />7 Concrete Curb and Gutter B612 1,46(] LF $ 7.50 $ 10,950.00 1460 $ 10,950.00
<br />8 Sign Panels, Type C 28l SF $ 50.00 $ 1,400.00 $
<br />9 4" Single Solid White - Paint 1,80(] LF $ 0.38 $ 684.00 $
<br />10 Crosswalk- Epoxy I EA $ 395.00 $ 395.00 $
<br />11 Directional Arrows - Epoxy 3 EA $ 125.00 $ 375.00 $.
<br />12 Disabled White Parking Symbols - Paint 2 EA $ 55.00 $ 110.00 $
<br />13 4" Disabled White Parking Hatching- Paint 16(3 LF $ · 0.38 $ · 60.80 $
<br />
<br />Total Bid Schedule "E" - Additional Parking Lot $ 63,816.80 $ 47,034.87
<br />
<br />CHANGE ORDER #t
<br /> Estimated Used to
<br />Item Description Quantit Unit Price Contract Price Date Extension
<br />
<br />1 Additional Excavation and Embankment 398 (~Y $ 3.00 $ 1,170.00 390 $ 1,170.00
<br />2 Additional Select Granular Borrow 3,395 CY $ 7.78 $ 26,413.10 3395' $ 26;413.10
<br /> Negotiated Reduction for Select Granular
<br />3 Borrow 8,395 CY $ (1.00) $ (8,395.00) 8395 $ (8,395.00) i
<br />4 Credit to Use City Borrow 8,395 CY $ (1.00) $ (8,395.00) 8,395 $ (8,395.00)
<br />5 Geotextile Fabric Type V (10,550 SY $ 0.94 $ (9,917.00) $
<br />6 Se,lect Granular Borrow (Base Trail Bid) (3,950) CY $ 8.43 $ (33,298.50) $
<br />7 60' Dia. Catch Basin vs 48" Dia. Catch Basin 1 EA $ 300.00 $ 300.00 1 $ 300.00
<br />
<br />Total Change Order #1
<br />
<br />$ (32,122.40) $ 11,093.10
<br />
<br />RA726PE#2Pay Esl~male//2 PE - 3
<br />
<br />
<br />
|